Opportunity
PIEE #W9126G26RA028
Construction of Basic Military Training, Dining and Classroom Facility at Joint Base San Antonio-Lackland
Buyer
W076 ENDIST FT WORTH
Posted
June 18, 2026
Respond By
August 04, 2026
Identifier
W9126G26RA028
NAICS
236220, 238190
This opportunity is a major construction project at Joint Base San Antonio-Lackland, managed by the U.S. Army Corps of Engineers (USACE), W076 ENDIST FT WORTH office. - Government Buyer: - U.S. Army Corps of Engineers (USACE), W076 ENDIST FT WORTH - Project Scope: - Design-Bid-Build contract for a multi-story Basic Military Training, Dining and Classroom Facility #4 - Facility features: drilled pier foundation, concrete floor slabs, structural steel framing, masonry walls, standing seam metal roof, elevator - Includes kitchen, dining areas, and multiple classrooms to support two Airmen Training Complexes - All site improvements, utilities, pavements, and communications systems included - Environmental remediation required, including asbestos removal and hazard mitigation - Must comply with Department of Defense Unified Facilities Criteria 1-200-01 for permanent construction - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Unique/Notable Requirements: - Emphasis on environmental remediation and hazard mitigation - Facility must be designed for permanent use per DoD standards
Description
The U.S. Army Corps of Engineers (USACE) has been tasked with soliciting and awarding the Design-Bid-Build contract for the Basic Military Training, Dining and Classroom Facility #4. The Construction project consists of a multi-story facility with a drilled pier foundation, concrete floor slabs, structural steel framing, masonry walls, a standing seam metal roof system, and an elevator. The facility will include a kitchen, dining areas, and multiple classrooms for the residents of two Airmen Training Complexes. The project will also include all site improvements, utilities, pavements, communications systems, and other necessary work to provide a complete and fully operational facility. Environmental remediation and site preparation activities will be performed as required, including asbestos removal, and any additional work needed to mitigate potential hazard. Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01, General Building requirements.