Opportunity
City of Sebastian MyVendorLink #ITB B-26-03-COC
Award for Dyal Water Treatment Plant Carbon Dioxide System Replacement
Posted
December 17, 2025
Respond By
February 06, 2026
Identifier
ITB B-26-03-COC
NAICS
237120, 237990, 236210
This opportunity involves the City of Cocoa Utilities/Engineering Department's award for the complete demolition and replacement of the carbon dioxide (CO2) system at the Dyal Water Treatment Plant. - Government Buyer: - City of Cocoa Utilities/Engineering Department, Purchasing & Contracts Division - Awarded Vendor: - L7 Construction, Inc. - Original Equipment Manufacturer (OEM): - TOMCO2 Equipment Company (existing CO2 tanks, models 98176170EHPC and 981755-70EHPC) - Products and Equipment Requested: - Replacement of two CO2 storage tank systems (50-ton capacity each) - Carbon dioxide gas yard piping and associated equipment - Carbon dioxide feed equipment (per specification section 43 13 10) - Recarbonation basin carrier water pumps (3 horizontal split-case centrifugal pumps) - Electrical panels, motor control centers (MCCs), lighting panels, transformers, and related electrical equipment - Instrumentation and control systems (PLCs, control panels, transmitters, fiber optic communication) - Aluminum canopy structures and concrete equipment pads/foundations - Piping systems (CO2 gas, carrier water), pipe supports, and flexible joints - Fiber optic and network equipment for SCADA/control - Services Requested: - Complete demolition and removal of existing CO2 and fluoride storage tank facilities - Installation of new CO2 storage tank systems and associated mechanical, electrical, civil, and structural works - Installation of carbonic acid solution feed facilities, piping, and instrumentation modifications - Notable Requirements: - Licensed Florida General Contractor required - Mandatory pre-bid meeting - Detailed technical specifications for CO2 dosing, control, and demolition/installation - Project is not federally funded; American Iron and Steel requirements do not apply - Contract Value: - $4,831,700 (lump sum) - Period of Performance: - Work to commence within 10 days of notice to proceed; substantial completion within 330 calendar days; final completion 30 days after punch list
Description
The City of Cocoa is soliciting bids for the complete demolition and replacement of the existing Carbon Dioxide (CO2) system at the Dyal Water Treatment Plant. The project scope includes removal of the existing fluoride storage tank facilities and installation of new CO2 storage tank systems, gas yard piping, and associated equipment. A mandatory pre-bid meeting is scheduled for January 13, 2026, and bids are due by February 6, 2026. The project is anticipated to be awarded by March 10, 2026, with an awarded contract amount of $4,831,700.00 to L7 Construction, Inc.