Opportunity

North Carolina eVP #98-31280

Compressed Air Connections Installation for Textile Machinery at Gaston College

Posted

June 18, 2026

Respond By

July 14, 2026

Identifier

98-31280

NAICS

238290

This opportunity involves the installation of compressed air connections for new textile carding machinery at Gaston College's Fiber Innovation Center Carding Room. - Government Buyer: - Gaston College (Belmont, North Carolina) - OEMs Highlighted: - Prevost (compressed air piping system) - Elgi (air compressors) - Products/Services Requested: - Installation of new compressed air drops and associated piping - All new piping must match the existing Prevost compressed air piping system - Includes connection types, pressure gauges, moisture traps, pressure regulators, shut off valves, hangers, and supports - Coordination with the textile manufacturing equipment provider for final connection details, sizes, and required pressures - Compliance with all applicable codes and regulations, including necessary permits and North Carolina HVAC contractor licensing - Unique/Notable Requirements: - All new piping must be compatible with the existing Prevost system - The compressed air system includes two Elgi air compressors (300 icfm at 125 psig each), a desiccant dryer, mist eliminator, and two storage tanks - Bidders must coordinate with the equipment provider for precise installation details - Only paper bid submissions are accepted; electronic bids are not permitted

Description

This solicitation is for the provision of multiple new compressed air drops with new piping to match the existing system from the existing ceiling level compressed air system to new owner-provided manufacturing equipment at Gaston College. The work includes providing all necessary appurtenances such as connection types, pressure gauges, moisture traps, pressure regulators, shut off valves, hangers, and supports to ensure a complete and operational system. All new piping must match the existing Prevost compressed air piping system. Coordination with the manufacturing equipment provider is required for final connection details, sizes, and required pressures.

View original listing