Opportunity
Shelby Township Granicus #26-19
Shelby Township CDBG Sidewalk and Curb Ramp Replacement Project (21 & 22 Mile Roads)
Posted
June 18, 2026
Respond By
July 09, 2026
Identifier
26-19
NAICS
237310, 238910
Shelby Township, Michigan is seeking qualified contractors for a Community Development Block Grant (CDBG) project focused on the replacement and installation of sidewalk and curb ramps along 21 & 22 Mile Roads and associated side streets. - Government Buyer: - Charter Township of Shelby (Shelby Township), Macomb County, Michigan - Scope of Work: - Removal and installation of sidewalks, curb ramps (various thicknesses), and curb and gutter - Utility structure adjustments, including sanitary manhole covers and drainage structures - Installation of detectable warning surfaces for ADA compliance - Surface restoration with topsoil and seeding - Erosion and sedimentation control, including inlet filters and regular inspection/maintenance - Traffic control and maintenance throughout construction - Audio-visual record of construction area prior to work - Bonds, insurance, and mobilization required - Products/Services Requested: - Concrete curb ramps (4", 6", 8" thicknesses), curb and gutter, sidewalk and pavement removal, brick paver removal, aggregate base, detectable warning surfaces, hand patching, surface restoration, erosion control inlet filters, utility structure adjustments, signage - Quantities include: over 2,000 sq ft of curb ramps, hundreds of feet of curb and gutter, and multiple erosion control and restoration items - Unique/Notable Requirements: - Strict compliance with soil erosion and sedimentation control standards as directed by Macomb County Public Works - Regular inspection and maintenance of erosion control measures - Restoration of all disturbed lawn surfaces with topsoil and seed - Project covers multiple locations along 21 & 22 Mile Roads - No specific OEMs or proprietary products are named; the solicitation is open to all qualified civil construction contractors
Description
This solicitation is for the replacement of ramps at 21 & 22 Mile roads as part of a Community Development Block Grant (CDBG) project. The work includes removals, concrete work, restoration, and erosion control measures. The project involves construction activities such as sidewalk and curb ramp removals and installations, utility adjustments, and soil erosion and sedimentation control. The estimated total project cost is approximately $160,700. The project is located in Shelby Township, Michigan.