Opportunity

Huntington Beach Planet bids #CC 1698

Upgrades to Well 4 facility in Huntington Beach, including demolition, new well pump installation, and related infrastructure improvements.

Posted

June 16, 2026

Respond By

July 21, 2026

Identifier

CC 1698

NAICS

237110, 237990, 238290

This opportunity involves upgrades to the City of Huntington Beach's Well 4 facility, which supplies groundwater to the Peck Reservoir. - Buyer: City of Huntington Beach PUBLIC WORKS department - Scope includes: - Demolition and removal of the existing well pump building, foundation, field instruments, electrical components, well tubing, and wellhead piping - Salvage of the existing leased well pump, motor, and VFD for the leasing firm - Installation of a new 75 Hp well pump, tubing, well-head, and modifications by a specialized well reconditioning subcontractor - Construction of a new building with concrete foundation and slab - Installation of discharge steel fusion bonded epoxy lined pipe (6” to 12” diameter) - Hydraulically controlled pressure sustaining valve with flow metering and monitoring system - Centrifugal liquid-solids separator, valves, field instruments, 480VAC electrical gear, and pump VFD - PLC programming and controls configuration handled separately by the City's controls firm - Optional demolition of the Well 4 chlorine building - Notable requirements: - Compliance with California Code of Regulations and Title 24 standards - Bidders must have at least ten years of experience in water production facility construction and installation - No specific OEMs are named; potential vendors include specialized well reconditioning firms and suppliers of pumps, valves, and instrumentation

Description

This solicitation is for upgrades to the existing Well 4 facility in Huntington Beach, CA. The scope includes demolition and removal of existing well pump building and equipment, installation of a new 75 Hp well pump, tubing, well-head, and related modifications by a specialized subcontractor. Additional work involves constructing a new building, concrete foundation, discharge piping, pressure sustaining valve with flow metering, liquid-solids separator, valves, field instruments, electrical gear, and pump VFD. PLC programming is handled separately by the City's controls firm. Demolition of the Well 4 chlorine building is an optional scope item.

View original listing