Opportunity

Georgia Procurement Registry #PE-66723-NONST-2026-000000016

Site Civil and Infrastructure Construction for Rolling Oaks Subdivision, Swainsboro, GA

Posted

June 16, 2026

Respond By

July 16, 2026

Identifier

PE-66723-NONST-2026-000000016

NAICS

237110, 237310, 237990

This opportunity involves the City of Swainsboro, Georgia seeking bids for major site civil and infrastructure construction for the Rolling Oaks Subdivision: - Government Buyer: - City of Swainsboro, Georgia (local government) - Scope of Work: - Complete site staking and surveying for subdivision layout - Heavy earthwork including excavation and grading - Roadway construction with curb, gutter, and storm drain systems - Sidewalk installation throughout the subdivision - Installation of water and sewer lines using plastic pipe (including PVC and fiber reinforced plastic) - Construction of a stormwater detention pond - Implementation of soil erosion and sediment control measures - Products/Materials: - Plastic pipe (including fiber reinforced plastic, polybutylene, and PVC) for water and sewer lines - Services: - Surveying, earthwork, road and sidewalk construction, utility installation, stormwater management, and erosion control - Notable Requirements: - Bidders must have a State of Georgia Utility Contractor License - A certified Utility Manager must oversee the work - Bid, performance, and payment bonds are required - Construction period is 180 consecutive calendar days - No specific OEMs or vendors are named in the solicitation - Drawings and specifications are available for inspection at designated locations

Description

This solicitation is for furnishing all materials, equipment, and labor for the construction of the Rolling Oaks Subdivision site civil and infrastructure for single family homes, excluding housing and lot finish grading. The work includes site staking and survey, heavy earthwork, roadway construction including curb and gutter and storm drain, sidewalk, installation of water and sewer lines, detention pond, and soil erosion and sediment control. The project requires a State of Georgia Utility Contractor License and oversight by a state Utility Manager certificate holder. The construction period is 180 consecutive calendar days.

View original listing