Opportunity
City of Pomona PlanetBids #2026-08
Street Rehabilitation Project – Districts 2 & 3, Phase I (City of Pomona IFB 2026-08)
Posted
June 16, 2026
Respond By
July 07, 2026
Identifier
2026-08
NAICS
237310, 237990
The City of Pomona Public Works Department is seeking bids for a major street rehabilitation project in Districts 2 and 3, Phase I, under Federal Project No. STPL-5070(044). - Government Buyer: - City of Pomona Public Works Department - City Engineer's Office - Scope of Work: - Complete street rehabilitation including asphalt pavement removal and replacement, sidewalk and curb improvements, ADA-compliant curb ramps, alley intersection upgrades, chain link fence replacement, and utility adjustments - Traffic control, electronic signage, and installation of traffic signal loop detectors - Signing and striping for roadways, including bike lanes and fire hydrant markers - Water pollution control and stormwater compliance (SWPPP) - Construction survey and monument preservation - Additive alternates for additional sidewalk and alley intersection work - Products/Services Requested: - Asphalt concrete (various mixes and thicknesses) - Portland cement concrete (sidewalks, curbs, ramps, spandrels) - Chain link fencing - Traffic signal loop detectors - Signing and striping materials - Geotechnical pavement engineering investigation (site reconnaissance, pavement coring, soil testing, engineering analysis) - Quantities & Part Numbers: - Cold Mill 4" AC with Crack Fill & Seal: 150,000 sq ft - Construct 3/8" ARAM interlayer: 150,000 sq ft - Construct 2.5" AC (B-PG 64-10): 2,300 tons - Construct 1.5" AC (ARHM-GG-C): 1,400 tons - Remove and Replace PCC Sidewalk: 400 sq ft (base), 1,500 sq ft (additive alternate) - Remove and Replace C&G: 25 linear feet - Remove & Replace Chain Link Fence: 25 linear feet - Adjust Manhole: 15 each - Adjust Water and Gas Valve: 19 each - Install Traffic Signal Loop Detectors: 6 each - Remove and Replace Alley Intersection: 1 each (additive alternate) - Unique/Notable Requirements: - Compliance with federal prevailing wage and Buy America provisions - Valid California Class A contractor license required - Bid bond or equivalent security mandatory - Completion within 45 working days for base work, 20 days for additive alternates - One-year warranty after project completion - Electronic bid submission via PlanetBids - No specific OEMs or branded products are named; contractors must supply all materials and equipment per city and federal standards - Estimated Contract Value: - $950,000 - **No OEMs or named vendors specified; all materials must meet city and federal standards.
Description
The City of Pomona is soliciting bids for the construction project IFB 2026-08, which involves street rehabilitation in Districts 2 and 3, Phase I. The work includes furnishing all materials, equipment, tools, labor, and incidentals as required by the specifications and contract documents. The project covers various construction activities such as mobilization, water pollution control, construction survey, traffic control, pavement milling and overlay, sidewalk and curb replacement, and installation of traffic signal loop detectors. The estimated contract value is $950,000, and bids must be submitted electronically by July 7, 2026.