Opportunity
University of Minnesota Ionwave #02-307-24-3057
University of Minnesota Solicits Construction Services for St. Paul Gym Water and Sewer Line Replacement
Posted
June 15, 2026
Respond By
July 06, 2026
Identifier
02-307-24-3057
NAICS
237110, 237990
The University of Minnesota is seeking construction services to replace aging water and sewer infrastructure at the St. Paul Gym on its St. Paul Campus in Minneapolis, MN. - Government Buyer: - Board of Regents of the University of Minnesota (St. Paul Campus, Facilities Management, Capital Project Management) - OEMs and Vendors: - Tideflex Technologies (CheckMate UltraFlex in-line check valve specified or approved equal) - No other specific OEMs mandated; standard construction materials and products required - Products/Services Requested: - Replacement of 4-inch general water service pipe and sewer line - Installation of PVC and ductile iron piping (various sizes: 4", 6", 8", 10", 12") - Installation of check valves (Tideflex CheckMate UltraFlex or equal) - Construction and rehabilitation of manholes (sanitary and water) - Cured-in-place pipe (CIPP) lining for sewer rehabilitation - Concrete work: walkways, landscape walls, curbs, gutters - Landscaping restoration: turf, seed mix, fertilizer, irrigation - Site work: trenching, backfilling, erosion control, sediment control, silt fencing - Traffic control, tree protection, temporary fencing, and site restoration - Temporary water service and irrigation system allowance - Unique/Notable Requirements: - Strict adherence to prevailing wage rates and University construction standards - Careful staging and scheduling to minimize disruption to summer camp activities (water switchover restricted until after summer camps) - Compliance with MnDOT standards for traffic control and environmental protection - Project budget is $350,000 - Architect/Engineer of Record: Bolton & Menk Consultants - Substantial completion required by a specified deadline, with overall duration spanning several months
Description
The University of Minnesota is requesting proposals for construction services to replace the 4-inch general water service pipe and sewer line at the St. Paul Gym located on the St. Paul Campus. The project involves removal and replacement of water and sewer infrastructure that is beyond its useful life. The work requires careful staging and scheduling to minimize impacts on summer operations. The total construction budget is $350,000, and the project must be substantially complete by September 4, 2026.