Opportunity

Lake Jackson Civicplus #26-03-004

Engineering Design Services for Dewatering System at The Wilderness Golf Course

Posted

May 31, 2026

Respond By

June 24, 2026

Identifier

26-03-004

NAICS

541330, 541310

The City of Lake Jackson is seeking qualified engineering firms to design a new dewatering system for The Wilderness Golf Course in Lake Jackson, Texas. - Government Buyer: - City of Lake Jackson, Purchasing Department - Scope of Work: - Engineering design services for a self-contained, remotely operated dewatering system - System must support a nominal capacity of 8,000 gallons per minute (gpm) - Must operate unattended for at least 10 days during a power outage - Design must be independent of the existing system - Pipeline design for a minimum 20-year service life - Specification of an axial or alternative high specific speed diesel-driven pump - Diesel fuel storage system with flood protection - Civil work for installation - Remote control and monitoring system with local and remote emergency shutdown capability - Products/Services Requested: - Preliminary engineering design services (no specific part numbers or quantities for products; main deliverable is the design package) - Unique/Notable Requirements: - System must be reliable, self-contained, and capable of remote operation - Must function for 10 days without external access or power - Flood-resistant fuel storage - Remote monitoring and emergency shutdown - No specific OEMs or vendors are named in the solicitation.

Description

The City of Lake Jackson is seeking sealed Qualifications Statements from firms qualified to provide engineering design services for the proposed Dewatering Capital Improvement Project at the Wilderness Golf Course. The project involves preparing a preliminary engineering design proposal to install a reliable self-contained and remotely operated dewatering system independent of the existing system. The design should support a nominal capacity of 8000 gpm and operate during an extended power outage for at least 10 days without external access. The scope includes pump specification, pipeline design, diesel fuel storage, civil work, and remote control and monitoring system proposals.

View original listing