Opportunity
Frostburg Municode #PINEY VFD INSTALLATION SUMMER 2026
Installation of Variable Frequency Drives (VFDs) at Piney Reservoir Pump Station for City of Frostburg
Posted
June 15, 2026
Respond By
July 07, 2026
Identifier
PINEY VFD INSTALLATION SUMMER 2026
NAICS
238290
This opportunity seeks contractors for the installation of variable frequency drives (VFDs) at the Piney Reservoir Pump Station for the City of Frostburg. - Government Buyer: - City of Frostburg (local government, Allegany County, MD) - Products/Services Requested: - Three VFDs to be installed on existing vertical turbine water pumps - Two VFDs for 150 HP pumps (480V, 3-phase) - One VFD for a 225 HP pump (480V, 3-phase) - All necessary wiring and configuration changes to integrate VFDs with existing pumps - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Notable Requirements: - Sealed proposal submission is required - Attendance at a pre-bid conference at the pump station is mandatory - Integration with existing pump infrastructure is essential
Description
This solicitation is for the installation of three variable frequency drives (VFDs) at the City of Frostburg's Piney Reservoir Pump Station. The VFDs will be installed on three existing vertical turbine water pumps operating on 480-volt, three-phase power, with two pumps rated at 150 horsepower each and one at 225 horsepower. The work includes wiring and configuration changes necessary for the installation. Proposals must be submitted by July 7, 2026, and a pre-bid conference will be held on June 30, 2026, at the pump station location.