FAA Environmental Soil Remediation and Restoration Services at Three Sites

Buyer

Volpe Center

Posted

June 15, 2026

Respond By

June 24, 2026

Identifier

6913G626Q300035

NAICS

238910, 562910, 562211, 541620

This opportunity seeks environmental remediation and restoration services for three FAA facilities with lead and petroleum hydrocarbon (TPH) soil contamination. - Government Buyer: - U.S. Department of Transportation, Volpe National Transportation Systems Center (Volpe Center), supporting the Federal Aviation Administration (FAA) Eastern Service Area - Key contacts include Michelle Heimgartner (Office V326) and Roland Regan (FAA Facilities Environmental Cleanup Program) - Scope of Work: - Soil remediation, disposal, and site restoration at: - BHM ASR (Birmingham, AL): Up to 15 cubic yards of lead and petroleum hydrocarbon-contaminated soil, removal depth 18-24 inches - CXY LOM (New Cumberland, PA): Up to 15 cubic yards of lead-contaminated soil, removal depth 18 inches - IADN NASEB (Chantilly, VA): Up to 3 cubic yards of TPH-contaminated soil, removal depth up to 5 feet - Preparation and submission of detailed Work Plans (technical approach, schedule, disposal methods, permits) - Site Safety and Health Plan (SSHP) and Risk Management Plan required - Site close-out reporting and documentation - Products/Services Requested: - Remediation and restoration services (no specific OEM products required) - Estimated soil volumes: 15 CY (BHM ASR), 15 CY (CXY LOM), 3 CY (IADN NASEB) - CLINs: 00100 (BHM-ASR), 00200 (CXY-LOM), 00300 (IADN NASEB) - NSN part number 7540-01-152-8067 referenced for IADN NASEB remedial action - Unique/Notable Requirements: - Compliance with the most stringent applicable Federal, State, and local environmental regulations - No demolition or asbestos abatement required - Contractor responsible for disposal sampling and paperwork; government will conduct confirmatory sampling - Work hours limited to weekdays, 8:00 a.m. to 4:30 p.m., excluding federal holidays and weekends unless approved - Sites include sensitive locations such as an Army National Guard Base and active airport facilities - OEMs/Vendors: - No specific OEMs or commercial vendors are named; services are the primary procurement focus

Description

Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at three facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The sites requiring remediation for lead- and total petroleum hydrocarbon (TPH) -contaminated soils are listed below:

BHM ASR – Birmingham, AL (33.57378°, -86.75671°) CXY LOM – New Cumberland, PA (40.178196°, -77.005692°) IADN NASEB – Chantilly, VA (38.958736°, -77.43499°)

The FAA's ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites.The Contractor shall conduct all work in accordance with Federal, State and local requirements.  Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.

This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. Please note that the GFI Site Survey Report provided for the CXY site is for demolition activities. This document is provided because it contains soil sampling results for this site. There will be NO demolition or asbestos abatement required as part of this project. The removal quantities and depths in the Preliminary Assessment and/or Site Investigation and Site Survey reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2.

The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work.

Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks.

An outline summarizing the required content of the work plan is shown below:

Technical Approach

<ol>
    <li><strong>Method and procedures for soil remediation, removal, disposal (all as required above in section 1.1), and restoration</strong></li>
    <li><strong>Identification of required work permits</strong></li>
</ol>
</li>
<li><strong>Site Safety Health Plan (SSHP)</strong></li>
<li><strong>Risk Management Plan</strong>
<ol>
    <li><strong>Identification of major risks</strong></li>
    <li><strong>Risk mitigation plan</strong></li>
</ol>
</li>

The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.

Preliminary Assessment/Site Investigation (PA/SI), Site Investigation (SI) and Site Survey activities completed in 2024 found the below sites showing contamination above either FAA action levels or EPA/State regulatory limits. Examples include lead-in-soil concentrations above the FAA’s cleanup standard of 200 mg/kg (ppm) or the applicable state standard, or TPHs in soil above EPA or State regulatory limits. For each site, prior to mobilizing to the site for the remedial activities, waste characterization samples shall be collected. Once these samples are analyzed, the proper landfill and disposal approvals shall be obtained. For each site, contaminated soil and/or equipment shall not be left at the site overnight unless previous permission is obtained by the contractor. Any equipment or material left at the site must be secured by the contractor and is not the responsibility of the government.

Adidtional details for requirement are found in the SOW.