Opportunity
Upper Arlington Ionwave #UA26-32
City of Upper Arlington 2026 Sidewalk Maintenance - Replacement Project
Posted
April 08, 2026
Respond By
April 22, 2026
Identifier
UA26-32
NAICS
237310, 238110, 238910
This opportunity involves the City of Upper Arlington's 2026 Sidewalk Maintenance - Replacement Project, focusing on concrete sidewalk and related infrastructure upgrades. - Government Buyer: - City of Upper Arlington, Division of Purchasing - Scope of Work: - Replacement, grinding, or meandering of short sections of 4-inch concrete sidewalks at various city locations - Construction of ADA-compliant concrete walkways (4" standard, 6" at driveways, 8" in some areas) - Traffic control, roof drain replacement, excavation, backfill, grading, topsoil installation, and other incidental work - Additional tasks: tree removal and stump grinding (12"-18" and 19"-26" diameters), driveway pavement replacement, seeding and mulching, pipe roof drain replacement - Products/Services Requested: - 315 panels of 4" concrete walk replacement (Class S Concrete, part number 608) - 100 panels of 6" concrete walk replacement (MS Concrete, part number 608) - 6 panels of 8" concrete walk replacement (MS Concrete, part number 608) - 25 units of driveway pavement replacement (Type IIIA, part number 259) - 150 units of pipe roof drains replacement (part number 618) - 300 units of seeding and mulching (part number 659) - 100 units of topsoil furnished and placed (part number 659) - 5 trees removed and stump grinding (12"-18", part number 201) - 5 trees removed and stump grinding (19"-26", part number 201) - Tree replacement and landscaping allowances (contingency, part number Special) - Services: - ADA-compliant sidewalk construction - Traffic control during construction - Excavation, backfill, grading, and site restoration - Roof drain replacement - Labor services for skilled trades (e.g., carpenters, masons, electricians, laborers, etc.) per prevailing wage rates - Notable Requirements: - Compliance with prevailing wage rates as issued by the State of Ohio Department of Commerce - Adherence to the city's Affirmative Action Program and equal opportunity employment policies - Sidewalk panels removed must be replaced within 7 working days; topsoil must be installed within 7 days after sidewalk installation - No specific OEMs or branded products are mentioned, as the procurement is for construction services and standard materials.
Description
The City of Upper Arlington is soliciting sealed bids for the 2026 Sidewalk Maintenance - Replacement Project. The work involves replacing, grinding, or meandering short sections of 4" concrete sidewalks at various locations as directed within the city streets. The project includes constructing ADA compliant concrete walkways, traffic control, roof drain replacement, excavation, backfill, grading, topsoil installation, and other incidental work necessary to complete the project. Sidewalk panels removed must be replaced within 7 working days, and all topsoil must be installed within 7 days after sidewalk installation. The contractor is responsible for maintaining updated prevailing wage rate reports as issued by the State of Ohio Department of Commerce.