Opportunity

Upper Arlington Ionwave #UA26-29 Addendum 1

Site Abatement and Restoration Services for 3700 Riverside Drive, Upper Arlington

Posted

March 30, 2026

Respond By

April 13, 2026

Identifier

UA26-29 Addendum 1

NAICS

238910, 561730

The City of Upper Arlington Development Department is seeking bids for abatement and site restoration services at 3700 Riverside Drive to address property maintenance violations and restore the site to its original condition. - Government Buyer: - City of Upper Arlington Development Department - Scope of Work: - Restore approximately 4 acres to original, level grade - Replace perimeter erosion control measures to prevent soil, mud, and sediment runoff - Apply grass seed to prevent erosion and limit noxious weeds - Remove and dispose of remaining orange barrels and other debris - Install a 100-foot by 8-foot gravel path to maintain access to an onsite cell tower - Products/Materials Requested: - Grass seed for erosion control - Gravel for path installation - Removal/disposal of orange barrels - Services Requested: - Site grading and restoration - Perimeter erosion control replacement - Notable Requirements: - No specific OEMs or vendors are named; open to qualified contractors - No hazardous materials are known to be onsite - No utility work is required - No bid or performance bond required - Firm or fixed pricing required for 60 days - Construction activity limited to Monday through Saturday, 7:30 AM to 7:00 PM - Compliance with Upper Arlington Property Maintenance Code - Site visit recommended to assess dirt sufficiency for grading

Description

The City of Upper Arlington is seeking a vendor to perform abatement work on a property at 3700 Riverside Drive due to violations of outside storage and to restore the site. The scope includes restoring the property to its original level grade over 4 acres, replacing perimeter erosion control, applying grass seed to prevent erosion and limit noxious weeds, removing and disposing of remaining orange barrels, and adding a 100-foot by 8-foot gravel path to maintain cell tower access. The project requires compliance with the Upper Arlington Property Maintenance Code and all responses must be submitted through IonWave. The contract includes detailed bid requirements, forms, and contract terms.

View original listing