Opportunity

Upper Arlington Ionwave #UA26-3 Addendum 2

Pool Finish Removal and Replacement at Reed Road Water Park, Upper Arlington, OH

Posted

January 15, 2026

Respond By

January 30, 2026

Identifier

UA26-3 Addendum 2

NAICS

238390, 238990

This opportunity is for qualified contractors to perform pool finish removal and replacement at Reed Road Water Park in Upper Arlington, Ohio. - Government Buyer: - City of Upper Arlington, Ohio, Purchasing Division - Contact: Valerie Piccininni - Scope of Work: - Complete removal and replacement of pool finishes (floor, stairs, walls) for both lap/leisure and wading pools - Installation of new contrasting tile, lane lines, depth markers, and 1x1 waterline tile above the lazy river water line - Installation of 2x2 tile bands on both sides of expansion joints at pool wall/floor - Replacement of missing handholds at island areas - Removal and reinstallation of handrails, play structures, underwater pool lighting assemblies (18 units), rails at zero depth entry, and equalizer caps (2 units) - General demolition, legal off-site disposal with manifests, dust/debris control, utility coordination, and asbestos testing as required - Notable Requirements: - All work must comply with detailed technical specifications and plans - Maintain code-compliant radii at wall/floor joints - Prevailing wage and Affirmative Action Program compliance required - Lump-sum base bid; contractor must complete work within 45 calendar days from Notice to Proceed - OEMs and Vendors: - No specific OEMs or product part numbers are mandated; all materials must meet bid document standards - Water Technology, Inc. (WTI) is the project consultant (not an OEM) - Products/Services Requested: - Pool finish removal and replacement (lump sum) - Reinstallation of pool components (handrails, play structures, lighting, etc.) - Tile installation and handhold replacement - Demolition, disposal, and site controls

Description

Sealed bids are being solicited by the Division of Purchasing, City of Upper Arlington, Ohio, for the removal and replacement of the pool finish at Reed Road Water Park. The project includes work necessary to complete the contract in accordance with the plans and specifications provided. An optional pre-bid meeting is scheduled, and bidders must comply with the City's Affirmative Action Program. The contract involves pool refinishing including removal and reinstallation of pool finishes, handrails, play structures, and pool lighting assemblies.

View original listing