Opportunity

SAM #W912P526QA023

Inspection and Maintenance Services for Barkley Lock Emergency Lift Gate Machinery

Buyer

Nashville District, USACE

Posted

June 10, 2026

Respond By

July 10, 2026

Identifier

W912P526QA023

NAICS

811310

This opportunity from the U.S. Army Corps of Engineers, Nashville District, focuses on maintaining critical lock infrastructure: - Government Buyer: - U.S. Army Corps of Engineers, Nashville District (ENDIST NASHVILLE) - Barkley Lock, Grand Rivers, KY - Scope of Services: - Inspection, cleaning, disassembly, reassembly, and maintenance of Barkley Lock Emergency Lift Gate machinery - Components include limit switch assemblies, motors, enclosed gears, open gears, gear mounting assemblies, drums, sheaves, wire rope, brakes, shaft bearings, couplings, and control equipment - Contractor must provide initial inspection reports with photographic evidence of deficiencies - Touch-up painting required on exterior surfaces after inspection; additional painting if contract options are exercised - As-built reports required for open gears, limit switch assemblies, and enclosed gears (PDF mark-ups acceptable; no CAD drawings needed) - Contractor must supply new oil, grease, filters, fasteners, keys, and other materials as needed - Unique Requirements: - Detailed reporting with photographic evidence - Restoration of machinery to operational status - No specific OEMs, part numbers, or brands are mentioned - No administrative or procedural details included - No specific period of performance or contract value provided

Description

Contractor shall provide all labor, material, and equipment necessary to clean, disassemble/reassemble, and inspect all lifting machinery for the Barkley Lock Emergency Lift Gate, including but not limited to the limit switch assemblies, motors, enclosed gears, open gears, gear mounting assemblies, drums, sheaves, wire rope, brakes, shaft bearings, couplings, and control equipment. Provide the initial inspection reports with pictures of the equipment that show any deficiencies found during the inspection. Provide touch-up painting for all exterior surfaces of items in the scope of work after inspection except as otherwise noted. If a contract option is exercised, paint the respective components (except as otherwise noted) after the work in the contract option is completed. After completion, provide as-built reports that show as-built fits, backlashes, contact patterns and end floats. Initial inspection reports and as-built reports shall be required for all open gears, limit switch assemblies, and enclosed gears. Mark-up of the PDF for as-builts are acceptable. No CAD drawings shall be required for the as-builts. Provide new oil, grease, filters, fasteners, keys, and others as needed to get the Emergency Gate (E-Gate) machinery ready for operation. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W912P526QA023Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module

View original listing