Opportunity
CanadaBuys #7724
Reconstruction of Bituminous Pavement and Roadworks on Provincial Road 201, Manitoba
Posted
June 12, 2026
Respond By
June 26, 2026
Identifier
7724
NAICS
237310, 238990
This opportunity involves a major road reconstruction project in Manitoba: - Government Buyer: - Manitoba Transportation and Infrastructure, Tendering and Contracts - Scope of Work: - Reconstruction of bituminous pavement on Provincial Road 201, from Provincial Trunk Highway 59 to Provincial Road 302 - Total project length: 20.6 km, located in the Rural Municipalities of Emerson-Franklin and Stuartburn - Products/Services Requested: - Grade widening, pulverizing existing pavement, granular base course (shoulders) - Mobilization of equipment, traffic control (Level IV), pilot vehicle services - Mowing, supply and installation of straw wattle for erosion control - Stripping slopes, bench cuts, shoulder preparation (Type II, 200 mm and 300 mm) - Pulverization and removal of existing asphalt pavement (including bridge deck) - Installation of non-woven geotextile, supply of various granular base materials (GSB-F, CR-M50, GBC-I, GBC-S) - Application of prime coat, installation of bituminous pavement (SP19.0 and SP12.5 Superpave Class C, including bridge deck) - Trimming, seeding (cover crop and perennial vegetation), supply and placement of erosion blanket (Class 1, short life) - Installation of rumble strips (shoulder and centreline) - Use of construction equipment: hydraulic excavator, crawler tractor and dozer, motor grader, tandem truck, semi-trailer truck, hydrovac truck - Quantities and part numbers are specified for each service line item - No specific OEMs, branded products, or vendors are mentioned - Notable Requirements: - Extensive environmental controls (erosion blankets, straw wattle, seeding) - Detailed traffic management and safety provisions - Comprehensive site preparation and finishing services
Description
This solicitation is for the construction of a bituminous pavement including grade widening, pulverizing existing pavement, and granular base course (shoulders) on Provincial Road 201, from Provincial Trunk Highway 59 to Provincial Road 302, covering a total construction distance of 20.6 km. The work is located in the Rural Municipalities of Emerson-Franklin and Stuartburn. The contract includes various line items such as mobilization, traffic control, pilot vehicle services, mowing, supply and installation of straw wattle, stripping slopes, bench cuts, shoulder preparation, pulverization, removal of asphalt pavement, geotextile installation, granular base supply, prime coat application, bituminous pavement, trimming, seeding, erosion blanket placement, rumble strip installation, and equipment usage. The estimated contract period is 0 months with a proposed start date of July 24, 2026. Bidding documents are available on MERX, and fees may apply.