Opportunity
Unalaska Municode #ROBERT STORRS HARBOR - A & B FLOAT REPLACEMENT
City of Unalaska Seeks Bids for Robert Storrs Harbor A & B Float Replacement Project
Posted
June 13, 2026
Respond By
July 14, 2026
Identifier
ROBERT STORRS HARBOR - A & B FLOAT REPLACEMENT
NAICS
237990, 238990
The City of Unalaska Department of Public Works is seeking bids for the Robert Storrs Harbor A & B Float Replacement project, a comprehensive harbor infrastructure upgrade. - Government Buyer: - City of Unalaska, Department of Public Works - Scope of Work: - Demolition and removal of existing A & B floats at Robert Storrs Small Boat Harbor - Installation of new float system, including: - Mainwalk, headwalk, and finger floats (various sizes and quantities) - Aluminum gangway (6 x 80 ft) and gangway landing float (24 x 20 ft) - Steel pipe piles (3,790 linear feet of 24-inch diameter, 0.500-inch wall) - Pile mooring frames, pile anodes (supply and installation), and pile installation with shoe in drilled socket - Safety equipment: life ring cabinets, fire extinguisher cabinets, fixed and deployable safety ladders - Construction of concrete seawalks, abutments, curb and gutter, and area drains - Installation of new electrical and lighting systems, electrical support assemblies, and fire suppression system - Stormwater and sanitary sewer systems, including various sizes of storm drain pipes, catch basins, oil water separators, and outfall structures - Construction of a public restroom facility - Erosion and sediment control, contaminated materials removal (100 CY), and construction surveying - Final design of moorage floats required - Notable Requirements: - Compliance with all local, state, and federal regulations - Removal and disposal of contaminated materials - Provision and installation of safety and fire suppression equipment - Technical contact: PND Engineers, Inc. - OEMs and Vendors: - No specific OEMs or manufacturers are named; project is open to qualified contractors able to meet technical specifications - Quantities and Technical Details: - Multiple floats (mainwalk, headwalk, finger floats in various sizes and quantities) - 3,790 LF steel pipe pile - 5 life ring cabinets, 5 fire extinguisher cabinets, 4 fixed safety ladders, 3 deployable safety ladders - 67 pile anodes supplied, 160 pile anodes installed - 100 CY contaminated materials removal, 500 CY Class A shot rock borrow, 4,000 CY Class B shot rock borrow, 1,500 CY armor rock - 75 CY concrete seawalk, 80 LF curb and gutter
Description
The Robert Storrs Small Boat Harbor A & B Float Replacement project involves removing the existing A and B floats and reconfiguring the harbor to accommodate a new float system, gangway, and creating uplands for parking and a public restroom. The project includes replacing deteriorated floats and pilings, and updating electrical, lighting, and fire suppression systems. Bids are due by July 14, 2026, and a pre-bid conference is scheduled for June 25, 2026. The project is managed by the City of Unalaska and PND Engineers, Inc. is the technical contact.