Opportunity
Prince Edward Island #PEIG-TIE-2876-26035
Site Improvements for Brockton and East Prince Waste Management Facilities
Posted
June 11, 2026
Respond By
July 07, 2026
Identifier
PEIG-TIE-2876-26035
NAICS
237990, 238910
The Prince Edward Island Department of Transportation, Infrastructure and Energy is seeking bids for facility site improvements at the Brockton and East Prince Waste Management Facility (EPWMF) under the Island Waste Management Corporation. - Government Buyer: - Prince Edward Island Department of Transportation, Infrastructure and Energy - Island Waste Management Corporation (project owner) - No specific OEMs or commercial vendors are named in the solicitation - Scope of Work (for both Brockton and EPWMF): - Mobilization and demobilization - Environmental controls and traffic control - Excavation of earth waste (700 m3 at Brockton, 120 m3 at EPWMF) - Asphalt removal and demolition - Installation of granular base 'Class A' (1,110 m3 at Brockton, 395 m3 at EPWMF) - Select borrow (provisional quantities: 200 m3 at Brockton, 50 m3 at EPWMF) - Reinforced concrete (29 m3 at Brockton) - Reinstatement and R5 riprap - Asphalt paving (base and seal): - Brockton: 1,020 tonnes base, 460 tonnes seal - EPWMF: 365 tonnes base, 175 tonnes seal - Catch basin installation (2 units at Brockton) - HDPE storm pipe installation (300mm diameter, 90 meters at Brockton) - Ditching (120 meters at Brockton, 25 meters at EPWMF) - Precast concrete block work (0.6x0.6x1.8m): 200 blocks at Brockton, 50 at EPWMF - Unique/Notable Requirements: - Quantities for each item are specified for both sites - One-year warranty period required - Compliance with Canadian Free Trade Agreement (CFTA) and open competitive bidding - Sealed envelope submission and electronic access to tender documents - No proprietary or brand-specific products are required; all work is construction and site improvement services
Description
This solicitation is for facility site improvements at the Brockton and East Prince Waste Management Facility (EPWMF) under the Island Waste Management Corporation. The work includes mobilization, environmental controls, traffic control, excavation, asphalt removal, granular base installation, reinforced concrete, reinstatement, riprap, asphalt paving, catch basin installation, storm pipe installation, ditching, and precast concrete block work. The contract duration is approximately three months, starting August 4, 2026, and ending October 31, 2026. Tender submissions must be received in sealed envelopes by July 7, 2026, and tender documents are available electronically.