Opportunity

City of Santa Ana PlanetBids #23-6037

Construction of Memory Lane and Flower Street Bikeway and Traffic Calming Project in Santa Ana, CA

Posted

June 09, 2026

Respond By

June 30, 2026

Identifier

23-6037

NAICS

237310, 237990

This opportunity from the City of Santa Ana Public Works Agency seeks bids for the construction of the Memory Lane and Flower Street Bikeway and Traffic Calming project. - Government Buyer: - City of Santa Ana Public Works Agency - OEMs and Vendors: - Rain Bird (irrigation components) - Dayton Superior (concrete finishing products) - LBIW (removable steel plates) - Products and Services Requested: - Construction of Class IV protected bike lanes (monolithic PCC, modified A-2-8 curb and gutter) - Colored concrete (brick red) with exposed aggregate finish (Dayton Superior Topcast #50 or equal) - Raised crosswalks, bio-retention basins, drainage openings - Landscape and irrigation improvements (Rain Bird flood bubblers, valves, controllers, dripline components) - Traffic signal modifications and installation (LED heads, push buttons, solar beacons) - Water meter installation, fire hydrant assembly, manhole frame and cover adjustment - Asphalt concrete pavement, cold milling, PCC street removal, curb ramps, signage and striping - Removable steel plates (LBIW or equal) - Unique/Notable Requirements: - California Class "A" General Contractor license required - Compliance with ADA standards and City/Caltrans specifications - Protection and verification of existing utilities - Specific construction materials and finishes (e.g., colored concrete with exposed aggregate, two coats of sealer) - Liquidated damages for delays ($5,200 per calendar day) - Engineering supervision and phased construction - Estimated contract value: $4,850,000 - Duration: 120 working days - All bids must be submitted electronically, with hard copies for verification.

Description

This solicitation is for the construction of a new Class IV protected bike lane along with pedestrian improvements, sidewalks, concrete driveways, raised medians and islands, raised crosswalks, curb and gutter construction, curb extensions, ADA curb ramps, cross-gutters, catch basin reconstruction, landscape and irrigation improvements, traffic signal modifications, hybrid beacon installation, pavement rehabilitation, water quality BMPs, signage, and striping. The project requires a California Class "A" General Contractor license and has an estimated value of $4,850,000. The contract duration is 120 working days with liquidated damages of $5,200 per calendar day. Bidders must submit electronic bids and also provide sealed original hard copies for verification.

View original listing