Opportunity

Norcross Civicplus #199

Norcross Greenway Shared Use Path Construction – Bridges, Boardwalks, and Civil Works

Posted

May 18, 2026

Respond By

June 26, 2026

Identifier

199

NAICS

237310, 237990, 237110

This opportunity is for the construction of the Norcross Greenway – LCI Shared Use Path Enhancement project in Norcross, Georgia, managed by the City of Norcross Department of Public Works. - Scope of Work: - Construction of approximately 3.3 miles of shared-use path, including on-street and off-street segments, two bridges, and boardwalks - Major civil construction: grading, paving, drainage, bridge and boardwalk construction, traffic signal installation, erosion control, and utility relocations - Environmental mitigation: purchase of 243 legacy stream credits and 0.04 wetland credits for compensatory mitigation - Key Products and Quantities: - Steel H-piles (HP 12x53) for bridges and boardwalks (over 803 units) - Prefabricated pedestrian bridges (2 units) - 42-inch metal safety rail (3,110 units) - Concrete (Class AA, A, B) for bridges, culverts, and paving (various quantities) - Bar reinforcing steel for bridges and structures (over 16,800 units) - Storm drain pipes (various sizes, over 2,300 units) - Traffic signal equipment, steel strain poles, and detection systems - Specialized items: microwave vehicle detection system (Wavetronix), thermoplastic pavement markings, guardrails, and water main installations - Services: - Grading and site preparation, erosion and sediment control, utility relocations, traffic control, construction of boardwalks and bridges - Notable Requirements: - Compliance with Georgia DOT 2021 Standard Specifications, ADA, Buy America, environmental protection, and affirmative action for minority business enterprises - Federally funded with strict environmental and labor compliance - No specific OEMs mandated for bridges or major components; Wavetronix specified for vehicle detection system - GDOT prequalification required for bidders - Contract Details: - Duration: 730 calendar days from Notice to Proceed - Monthly progress payments - All work must be completed within the contract period

Description

The City of Norcross is soliciting bids for the construction of the Norcross Greenway – LCI Shared Use Path Enhancement project (P.I. NO. 0016067). The project includes approximately 3.3 miles of shared-use path starting southeast of Buford Highway/US23/SR13 on S. Cemetery Street and ending near Pinnacle Way. The trail features on-street and off-street segments, including roadway sections along Mitchell Road, Pinnacle Way, and Price Place, with undeveloped sections comprising two bridges and boardwalks. Bidders must comply with Georgia DOT standards and submit bids by June 26, 2026.

View original listing