Opportunity
SAM #19AU9026Q0009
U.S. Embassy Vienna Marine House Gym Remodeling Solicitation
Buyer
U.S. Embassy Vienna
Posted
June 11, 2026
Respond By
July 29, 2026
Identifier
19AU9026Q0009
NAICS
238390, 236220
This opportunity is for the remodeling of the gym/fitness room at the U.S. Embassy Marine House in Vienna, Austria. - Government Buyer: - U.S. Department of State - U.S. Embassy Vienna - Scope of Work: - Demolition of existing partition walls, doors, wall-cabinet, bathroom fixtures, ceiling lights, wall and floor tiles, and PVC flooring - Refurbishment including plastering, leveling, priming, and painting of walls and ceilings - Installation of new floor covering and PVC flooring - Delivery and assembly of six new ceiling lights, including switch, wiring, and integration into the existing electrical system - Final cleaning after completion - Unique/Notable Requirements: - Work must be performed while the facility remains operational - Strict adherence to U.S. Government security regulations and clearance processes for personnel and materials - Implementation of safety and protective measures throughout the project - No specific OEMs, brands, or part numbers are specified in the solicitation - No vendors are named; the opportunity is open to qualified general contractors
Description
This project is for the remodeling of the Gym/Fitness room at the U.S. Embassy Marine House, located in 1190 Vienna.
The old room structures and surfaces need improvement and renovation. The existing GYM will be expanded from 55m2 to 62m2, and the bathroom and a wall-cabinet will be demolished for this purpose.
Scope of work: General Contractor for Construction work and Electrical Installation
Demolition
Temporary plasterboard dust wall with door. Demolition of partition walls (10cm), incl. wall coverings, 2 wooden doors+ doorframes and 1 wooden cabinet, electrical installation and equipment, incl. removal and disposal. Demolition, removal and disposal of the existing wall- and floor tiles and in the bathroom, existing sanitary items and equipment in the bathroom, including pipes, and the PVC flooring incl. glue. Removal of 4 existing ceiling lights.
Refurbishment
Walls and ceiling: plaster, level, clean, prime, paint to cover, incl. 16m2 floor covering material.
Floor: Clean, grind and level the floor; New PVC flooring in the demolition area. Delivery and assembly of 6 new ceiling lights in new position, Including switch, wiring, and integration into the existing system. Final cleaning
Special requirements
The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work USG Security regulations Clearance process for employees, cars, material on site Safety and protective measures
Execution periods
Indicative construction schedule: 5 weeks in fall 2026