Opportunity

City of Sebastian MyVendorLink #PR9169

Orlando Utilities Commission Microgrid Energy Storage System (ESS) Solicitation

Posted

June 10, 2026

Respond By

July 07, 2026

Identifier

PR9169

NAICS

221122, 237130

Orlando Utilities Commission is seeking proposals for the construction of a Microgrid Energy Storage System (ESS) with a 250 kW capacity. - Government Buyer: - Orlando Utilities Commission (local utility agency in Orlando, Florida) - Products/Services Requested: - Energy Storage System (ESS) with 250 kW generation capacity for 1-2 hours - System must be co-located with DC Fast Charging (DCFC) infrastructure for electric vehicles - ESS must export power to the grid based on utility signals and operate a microgrid during outages - Grid services required: peak shaving, solar smoothing, Volt/VAR regulation - Microgrid must support DCFC systems during outages - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Unique/Notable Requirements: - Suppliers must indicate compliance with technical requirements (Attachment D); non-compliance does not automatically disqualify - Insurance is required for participation - Detailed technical and pricing documentation required - Technical requirements focus on grid integration, microgrid operation, and EV charging support

Description

Orlando Utilities Commission is soliciting proposals from qualified suppliers to construct an Energy Storage System (ESS) capable of 250 kW of generation for 1-2 hours. The system will be co-located with DC Fast Charging for electric vehicles and must be able to export to the grid following a utility-centric signal and operate a small microgrid during outages. It will provide grid services such as peak shaving, solar smoothing, and Volt/VAR regulation during grid-connected periods and support DCFC systems during outages. Suppliers must indicate if their solution meets the requirements in Attachment D, though non-compliance does not disqualify the response.

View original listing