Opportunity
East Valley Water District Planet bids #142475
Complete Equipping of Well No. 129 for East Valley Water District
Posted
June 08, 2026
Respond By
July 09, 2026
Identifier
142475
NAICS
237110, 221310
This opportunity involves the complete equipping of Well No. 129 for the East Valley Water District in Highland, California. - Government Buyer: - East Valley Water District (local agency, Highland, San Bernardino County, CA) - Products and Equipment Requested: - 150 HP deep well vertical turbine pumping unit (includes 10" column pipe, 2" maximum open lineshaft, fabricated steel discharge head with 12" discharge flange) - 150 HP reduced voltage soft start motor control - Above-grade 12" diameter cement mortar lined steel discharge piping - Below-grade 12" diameter C900 PVC discharge piping with ductile iron pipe fittings - Electromagnetic flow meter (for measuring well discharge) - SHC (sodium hypochlorite) storage and injection facilities - Online SHC analyzer (for reservoir sampling) - Pressure transducer (for reservoir level monitoring) - Motor control center (MCC) for well facilities - SCADA panel (provided by District) - Masonry building to house equipment - Services Requested: - Complete installation, commissioning, and start-up of the well system and all associated facilities - Unique/Notable Requirements: - All materials, labor, tools, equipment, and transportation must be provided by the contractor - System must connect to two existing 3.0 MG steel reservoirs and existing booster station - Includes pump-to-waste pipeline with hydraulically operated diaphragm valve - SCADA panel is provided by the District, but contractor must integrate it - No specific OEMs are named; open to qualified contractors meeting license requirements - Quantities: - Most equipment is single-unit (1 each), with piping and fittings as required by design - No specific OEMs or vendors are named in the solicitation; the project is open to all qualified bidders.
Description
This project involves furnishing, installing, commissioning, and delivering a complete and fully functional well system for East Valley Water District Well No. 129. The work includes installing a 150 HP deep well vertical turbine pumping unit, associated piping, electrical and control systems, chemical injection facilities, and a masonry building to house equipment. The project also involves connections to existing reservoirs, installation of flow meters, pressure transducers, and SCADA control panels. The scope covers all materials, labor, tools, equipment, and transportation necessary to complete the work as per the bid documents.