Opportunity
PIEE #W9123726QA039
Piggyback Crane Repair Services for Meldahl Locks and Dam
Buyer
W072 ENDIST HUNTINGTON
Posted
June 10, 2026
Respond By
June 22, 2026
Identifier
W9123726QA039
NAICS
811310
This opportunity involves critical repairs to a piggyback crane at Meldahl Locks and Dam for the U.S. Army Corps of Engineers, Huntington District. - Government Buyer: - U.S. Army Corps of Engineers, Huntington District (W072 ENDIST HUNTINGTON) - Scope of Work: - Repair services for a piggyback crane at Meldahl Locks and Dam, Felicity, Ohio - Replace hydraulic swivel coupling and trolley hydraulic hoses - Replace existing brackets with draw chains - All components provided must be new - Contractor responsible for handling, maintaining, storing, and protecting all materials and equipment until installation and acceptance - De-energize crane system before removal; coordinate Lock-Out Tag-Out (LOTO) procedures with project personnel - Test crane after installation, remedy any issues, and retest until fully operational - OEMs and Vendors: - No specific OEMs, brands, or part numbers are mentioned in the solicitation - Unique/Notable Requirements: - Strict adherence to safety procedures (LOTO) - All replacement parts must be new - Full responsibility for testing and ensuring operational readiness after repairs
Description
This work consists of furnishing all labor, equipment, access, and materials for replacing the hydraulic swivel coupling and trolley hydraulic hoses that operate the hydraulic swivel coupling on the piggyback crane meeting the requirements of this specification at Meldahl Locks and Dam. The existing brackets shall be replaced by the contractor with draw chains. All components shall be new. The Contractor shall be responsible for the proper handling, maintenance, storage and protection of all materials and equipment until installed and accepted. Once all these items are installed, the Contractor shall test the crane to ensure the crane operates without further issues to these components. Contractor shall remedy any issues and retest until the crane is returned to service. Prior to any work being performed, the Contractor shall ensure that all crane operating machinery is properly secured and all components immobilized to prevent damage. The crane system must be de-energized prior to removal. Coordinate with the Project Personnel to properly Lock-Out Tag-Out (LOTO) the equipment being serviced. See attached photographs for further details.