Opportunity
New York State Contract Reporter #A37860
Major Construction and Rehabilitation at Brooklyn Bridge - City Hall Station (Lexington Ave Line)
Posted
June 09, 2026
Respond By
July 23, 2026
Identifier
A37860
NAICS
237310, 238190, 237130, 236220, 237990
This opportunity involves a major construction and rehabilitation project at the Brooklyn Bridge - City Hall Station on the Lexington Avenue line in Manhattan, managed by the MTA - NYC Transit (NYCT) through its Construction & Development division. - Government Buyer: - Metropolitan Transportation Authority (MTA) - NYC Transit (NYCT), Construction & Development division - Scope of Work: - Removal of glass blocks, granite pavement, concrete slabs, and bollards at street level - Repair of sculpture-mounted vertical art panels - Removal and replacement of electric lighting fixtures - Structural repairs to steel beams and concrete walls - Reinstallation of Automated Fare Control systems - Painting of columns and beams at the mezzanine level - Repair or replacement of drip pan steel structures or concrete slabs on the roof of the southbound tracks - Repair of structural defects in ventilator components on both southbound and northbound tracks - Temporary relocation, protection, and reinstallation of communication and electrical systems - Abandonment of the existing snow melt system - Installation of new normal and emergency LED lighting systems with associated conduits and wiring - Products/Services Requested: - LED lighting systems (normal and emergency backup) - Automated Fare Control systems (reinstallation) - Structural repairs (steel beams, concrete walls, ventilator components) - Construction and rehabilitation services (removal, replacement, painting, system relocation) - Unique/Notable Requirements: - Enhanced Utilization Credit to incentivize MWBE firms - Specific participation goals: SDVOB (6%), MBE (15%), WBE (15%) - Vendor registration with SAM and the MTA Vendor Portal required - No specific OEMs or vendors are named in the solicitation.
Description
This contract involves extensive construction and repair work at the Brooklyn Bridge City Hall station on the Lexington Avenue line. The scope includes removing glass blocks, granite pavement, concrete slabs, and bollards at street level; repairing art panels, lighting fixtures, steel beams, concrete walls, and painting at the mezzanine level. It also covers repairing or replacing drip pan steel structures or concrete slabs on the roof of the southbound tracks, fixing structural defects in ventilator components on both southbound and northbound tracks, and installing new LED lighting systems with emergency backup. The work requires temporarily relocating and reinstalling communications and electrical systems and abandoning the existing snow melt system.