Opportunity

Reno Planet bids #D100198 WA-2026-340

Paradise Park Pedestrian Bridge Replacement – Demolition, New Abutments, and Prefabricated Bridge Installation

Posted

May 28, 2026

Respond By

June 18, 2026

Identifier

D100198 WA-2026-340

NAICS

237310, 237990

The City of Reno Public Works Department is seeking proposals for the Paradise Park Pedestrian Bridge Replacement Project. - Government Buyer: - City of Reno Public Works Department - Project Scope: - Demolition and disposal of the existing pedestrian bridge and supports - Installation of two new concrete abutments, footings, and wingwalls - Placement and installation of a pre-fabricated pedestrian bridge (Wheeler 88-5' x 8' Steel Truss Recreation Bridge, furnished by owner) - Asphalt pavement and concrete curb replacement - Installation of bollards and metal safety handrails - Channel restoration, including riprap and boulder relocation - Storm water protection measures - Products/Line Items: - Wheeler 88-5' x 8' Steel Truss Recreation Bridge (OEM: Wheeler) - Aggregate base backfill (16 cubic yards) - Concrete abutments, foundations, and wing walls (1 set) - P.C.C. post curb replacement (28 linear feet) - New P.C.C. retaining curb, gutter, and post curb (9 linear feet) - Asphalt path replacement (633 square feet) - Metal safety hand railing (30 linear feet) - Removable bollards (2 units) - Salvage and relocate riprap (196 square feet) and boulders (12 units) - Storm water protection (56 days) - Notable Requirements: - Compliance with Nevada prevailing wage and apprentice utilization laws - Submission of a bid bond with the proposal - Project duration is 40 working days, with liquidated damages for delays - OEM Highlight: - Wheeler is the specified manufacturer for the steel truss bridge - Estimated contract value: $200,000 to $225,000

Description

This solicitation is for the replacement of the Paradise Park Pedestrian Bridge under Contract Number D100198. The work includes demolition and disposal of the existing bridge structure and supports, installation of two new concrete abutment structures, footings, and wingwalls, placement and installation of a pre-fabricated pedestrian bridge, and improvements to landing and pathway areas including asphalt pavement replacement, concrete curb replacement, bollards, and handrails. Channel restoration work including riprap placement is also part of the scope. The project duration is 40 working days with liquidated damages set at $1,000.

View original listing