Opportunity

Spartanburg Community College Scc #H59-N385-PD

Renovation and Enclosure of Giles Campus Horticulture Pavilion with HVAC and Electrical Upgrades

Posted

June 06, 2026

Respond By

July 07, 2026

Identifier

H59-N385-PD

NAICS

238220, 238290

Spartanburg Community College (SCC) is seeking bids for the renovation of the Giles Campus Horticulture Pavilion, focusing on enclosing and upgrading the facility. - Government Buyer: - Spartanburg Community College (SCC), Project Manager: David Barber - OEMs and Vendors: - Daikin (packaged heat pump unit) - Hilti, Tremco, 3M (firestopping systems) - Products and Equipment Requested: - Daikin DSH outdoor pad-mounted packaged heat pump (1 unit) - HVAC ductwork and metal ducts (galvanized steel, SMACNA standards) - Air duct accessories (flange connectors, turning vanes, remote damper operators, access doors, flexible connectors/ducts) - Penetration firestopping systems (Hilti, Tremco, 3M) - Joint sealants (silicone and urethane, ASTM/NFPA standards) - Electrical equipment (panelboards, fuses, switches, circuit breakers, low-voltage conductors, grounding, LED interior lighting) - LED cove mounted strip lighting system (minimum CRI 90, 50,000-hour rated life, dimmable, ENERGY STAR/Title 24 compliant) - Services Requested: - Design-bid-build construction services for pavilion enclosure and upgrades - Factory startup and training for heat pump unit - Testing, adjusting, and balancing (TAB) services for HVAC systems - Unique/Notable Requirements: - Minimum 1-year warranty on work, 5-year warranty on LED luminaires - Factory startup and training for Owner's personnel - TAB services must comply with ASHRAE, SMACNA, AABC, and NEBB standards - Firestopping and joint sealants must meet NFPA and ASTM standards - Liquidated damages for late completion ($250/day) - Performance and payment bonds required at 100% of contract price

Description

This solicitation is for the design-bid-build construction services for the renovation of the SCC - Giles Campus Horticulture Pavilion. The project involves enclosing the existing open-air pavilion with storefront windows, roll-up doors, and two exits. The space will be conditioned with a package heat pump unit and ducted supply/returns, and new electrical service and LED luminaires will be installed. The construction cost range is estimated between $380,000 and $410,000. Bids are due by July 7, 2026, at 2:00 PM.

View original listing