Opportunity
SAM #N400857440851
Replacement of Chillers and Cooling Tower at MCAS Cherry Point, Building 4225
Buyer
Naval Facilities Engineering Systems Command Mid-Atlantic
Posted
June 05, 2026
Respond By
July 07, 2026
Identifier
N400857440851
NAICS
238220, 238290
This opportunity involves the replacement of chillers and a cooling tower at Building 4225, Marine Corps Air Station Cherry Point, North Carolina, managed by the Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. - Government Buyer: - Department of the Navy, Naval Facilities Engineering Systems Command - Mid-Atlantic, Facilities Engineering & Acquisitions Division - U.S. Marine Corps, MCAS Cherry Point, Fleet Readiness Center East (FRCE) - Products and Equipment Requested: - Air-cooled rotary screw chillers (1 x 250 ton, 1 x 80 ton) - Chilled water pumps (3 x 20 HP with VFDs) - Temporary chillers (1 x 250 ton, 1 x 80 ton) and associated pumps - Expansion tank (60 gallon diaphragm type) - Chemical feeder for chilled water system - Control valves (5, various sizes) - Backflow preventer (RPZ-1, 30 PSIG) - Air separator and end suction pump - Heat trace cable and accessories - Fused safety switches (3, various amperages) - Motor control centers, switchboards, panelboards, transformers - Chain-link security fence and concrete equipment pads - Services Requested: - Demolition and removal of existing mechanical equipment and structures - Lead paint remediation (lead found on red riser piping and beige double doors) - Structural steel, concrete, HVAC testing and balancing, thermal insulation, painting, and commissioning - Quality control program, hazardous waste management, and construction waste diversion - Systematic commissioning and testing, adjusting, and balancing (TAB) for HVAC - Unique/Notable Requirements: - Temporary chillers and pumps must be provided to maintain building operations during construction - Strict environmental, safety, and quality control measures, including lead abatement and hazardous waste management - Compliance with Buy American construction material requirements - No specific OEMs or part numbers are mandated; equipment must meet detailed technical specifications - Project duration is 380 calendar days from contract award
Description
This procurement is restricted to the Mechanical MACC contractors. Only the Mechanical MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings.