The City of Coachella is seeking bids for a comprehensive public works project to improve the Avenue 53 Tot Lot, reconstruct the Avenue 53 and Calle Empalme intersection with a new roundabout, and replace a sewer main.
- Government Buyer:
- City of Coachella, Engineering Offices
- OEMs and Vendors:
- No specific OEMs or manufacturers are named in the solicitation
- Coordination required with Imperial Irrigation District (IID) and third-party playground contractors
- Products/Services Requested:
- Playground equipment and surfacing, including installation of shade structures
- Electrical Meter Pedestal cabinets and primary IID service conduits (procurement and installation)
- Replacement of existing 12" sewer main with 15" PVC main, including connections and epoxy coating of manholes
- Installation of new CMU and metal fencing
- Removal and replacement of site amenities, concrete, landscaping, and irrigation
- Roundabout construction: removal and replacement of concrete curb, gutter, cross gutter, AC pavement, sidewalk, apron, storm drain system, street lighting, slurry seal, signing, and striping
- Trench repair and sewer main installation
- Unique or Notable Requirements:
- Contractor must prioritize procurement and installation of electrical meter pedestal and IID service conduits
- Compliance with California prevailing wage laws
- Contractor licensing required (Class A and C-10 for electrical work)
- Performance and payment bonds required
- Registration with the Department of Industrial Relations required
- Plans and specifications available only through PlanIT Print Works
- Project completion required within 150 working days from Notice to Proceed

Description

The City of Coachella invites sealed bids for the Avenue 53 Tot Lot and Roundabout Improvements project, City Project No. P-29. The project includes reconstruction of the Avenue 53 Tot Lot area, reconstruction of the Avenue 53 and Calle Empalme intersection with a roundabout, and removal and replacement of a sewer main between Calle Leandro and Calle Techa. Work involves site amenities, concrete, landscaping, irrigation, fencing, electrical, pathways, street improvements, and sewer main replacement. The project must be completed within 150 working days from the Notice to Proceed.