Opportunity

Pompano Beach Ionwave #ITB26-031 Addendum 5

Pompano Beach Water Treatment Plant Improvements: Deep Injection Well, Monitor Well, and Well Abandonment

Posted

April 30, 2026

Respond By

June 08, 2026

Identifier

ITB26-031 Addendum 5

NAICS

237110, 237990

The City of Pompano Beach is seeking bids for major improvements to its Water Treatment Plant, focusing on deep well construction and related infrastructure upgrades. - Government Buyer: - City of Pompano Beach, Procurement and Contracts Department, Water Utilities - Project Scope: - Installation of a new Deep Injection Well (IW-2) - Installation of a new Dual-Zone Monitor Well (DZMW-1R) - Plugging and abandonment of the existing DZMW-1 well - Extensive site work, yard piping modifications, and well maintenance services - Products and Materials Requested: - Ductile iron piping (AWWA C151, C104, C110, C111, C115, C116, C150, C600, C606) - OEMs: U.S. Pipe, American Ductile Iron Pipe, McWane Ductile - Plastic pipe and fittings (PVC/CPVC, various ASTM standards) - Plug valves (Nordstrom Audco Valves, Inc.) - Check valves (Crane Company, Milwaukee Valve, Stockham Valves and Fittings, Wm. Powell Company, APCO, VAL-MATIC, ASAHI-AMERICA, George Fischer, Inc., NIBCO Inc., Spears Mfg. Co., Flygt, GA Industries, Plastic-O-Matic Valves, Inc.) - Air release and air/vacuum valves (Cla-Val Company, Flowmatic, APCO/DeZurik) - Polyethylene pressure pipe (AWWA C906; JM Eagle, WL Plastics, Performance Pipe) - Couplings/adapters (Dresser Company, Smith-Blair, Victaulic) - Butterfly valves (DeZURIK Water Controls Corporation, Flowseal, Masoneilan, Neles-Jamesbury) - Air release valves (Cla-Val Company, Golden-Anderson, OCV Control Valves, Ross Valve Mfg. Co., Singer Valve, Watts, ACV) - Services Requested: - Drilling, casing installation, cementing, geophysical logging, packer testing, water quality analysis, core collection, mechanical integrity testing, and site restoration - Lump sum and unit price line items for all major construction and well abandonment activities - Unique/Notable Requirements: - Compliance with American Iron and Steel (AIS) and Build America, Buy America (BABA) provisions - 24/7 drilling operations permitted - Contractor must demonstrate experience with similar deep well projects - Adherence to Florida Department of Environmental Protection and federal labor standards - Detailed technical specifications referencing AWWA, ASTM, ANSI, and ASME standards - OEMs Highlighted: - U.S. Pipe, American Ductile Iron Pipe, McWane Ductile, Nordstrom Audco Valves, Crane Company, Milwaukee Valve, Stockham Valves and Fittings, Wm. Powell Company, APCO, VAL-MATIC, ASAHI-AMERICA, George Fischer, NIBCO, Spears, Flygt, GA Industries, Plastic-O-Matic Valves, Cla-Val, Flowmatic, DeZurik, JM Eagle, WL Plastics, Performance Pipe, Dresser, Smith-Blair, Victaulic, Flowseal, Masoneilan, Neles-Jamesbury, Golden-Anderson, OCV Control Valves, Ross Valve, Singer Valve, Watts, ACV

Description

The City of Pompano Beach is soliciting bids for Water Treatment Plant Improvements Phase 1, which includes the installation of Deep Injection Well IW-2, Dual-Zone Monitor Well DZMW-1R, and the plugging and abandonment of existing DZMW-1. The project involves furnishing all labor, equipment, tools, materials, and related services for site work, installation and modification of existing yard piping, drilling and installation of new wells, and plugging and abandonment activities. The work is partially funded by the State Revolving Fund (SRF). Bids must be submitted electronically through the City's eBid System by June 8, 2026, at 2:00 PM ET. A non-mandatory pre-bidders conference and site visit will be held on May 6, 2026, at 10:00 AM local time at the project site.

View original listing