Opportunity

Anaheim Opengov #RCP2025-23096, RCP2025-23097, RCP2025-23098

Anaheim Roadway Rehabilitation: Harbor Blvd, Placentia Ave, and Miraloma Vicinity

Posted

June 04, 2026

Respond By

June 25, 2026

Identifier

RCP2025-23096, RCP2025-23097, RCP2025-23098

NAICS

237310, 238990

The City of Anaheim Public Works Department is seeking bids for a comprehensive roadway rehabilitation project covering Harbor Boulevard, Placentia Avenue, and the Miraloma Vicinity. - Government Buyer: - City of Anaheim, Public Works Department, Construction Services Division - Scope of Work: - Rehabilitation of major roadways, including removal and reconstruction of asphalt concrete pavement (using rubberized asphalt and conventional methods) - Crack sealing, cold milling (2.5" to 5.5" depths), and application of asphalt rubber hot mix (ARHM) and asphalt rubber aggregate membrane (ARAM) - Reconstruction of ADA-compliant access ramps, sidewalks, curbs, gutters, driveway approaches, and cross gutter spandrels - Installation and adjustment of utility structures (storm drain, sewer, water, telecom, electric, fiber optics, and communications vaults) - Replacement of traffic detection devices (Type "E" Circular per COA STD. 410), traffic signal and street light pull boxes - New traffic striping, signage, and pavement markings - Landscaping restoration and erosion/sediment control - Preparation of traffic control plans and coordination with SCRRA (Metrolink) - Unique/Notable Requirements: - Compliance with the Community Workforce Agreement (CWA) with local hire and labor compliance obligations - All contractors and subcontractors must be registered with the California Department of Industrial Relations - Specific contractor license requirements (General Engineering A, C-10, C-34, etc.) - Bid bond (10%) and mobilization cost cap (5% of base bid) - Estimated construction cost: $5,226,677.40 - Project duration: 70 working days - OEMs and Vendors: - Bingham & Taylor (valve boxes, Mark V round 10 rim/lid, no. 4906) - Typer Union (6860 heavy duty top section screw type cast iron valve box) - No other specific OEMs or vendors named; most materials are standard construction commodities - Quantities and Part Numbers: - See detailed line items below for quantities and descriptions of all major products and services.

Description

This project involves rehabilitating the roadway by removing and reconstructing the asphalt concrete pavement within the existing right of way using rubberized asphalt concrete pavement. The scope includes crack sealing, removal and reconstruction of ADA access ramps, driveway approaches, curb, curb and gutter, local depressions, sidewalk, replacement and adjustment of utility structures and pull-boxes, replacement of traffic detection devices, striping, signage, pavement markings, and all related work necessary for proper construction. The project aims to re-establish pavement structure, restore surface integrity, improve driving conditions, and enhance pedestrian safety on sidewalks. The work areas are limited to specified locations in Anaheim, California, and the project duration is seventy working days.

View original listing