Opportunity

SAM #140P6026Q0053

NPS Solicitation for Perimeter Fence Replacement and Security Upgrades at St. Croix National Scenic Riverway

Buyer

NPS MWR Midwest Region

Posted

June 04, 2026

Respond By

July 08, 2026

Identifier

140P6026Q0053

NAICS

238210, 238990

This opportunity seeks contractors to replace and upgrade perimeter fencing and storage security at two National Park Service (NPS) sites in Wisconsin. - Government Buyer: - National Park Service (NPS), St. Croix National Scenic Riverway, Midwest Region (MWR) - Contracting office: MWR - MWRO MABO - Scope of Work: - Remove approximately 678 linear feet of existing chain-link fence - Install 432 linear feet of new 7-foot-high K-Klass chain-link fence at the Lower District Shop - Install a 20-foot sliding gate with automatic gate operator system (LiftMaster INFL24UL or equivalent) - Install a 12-foot steel swing gate - Construct concrete bin block storage bays (five bays, 12' x 14', 4 blocks high) - At Ray's Garage: site prep, grading, compaction, and installation of 303 linear feet of 8-foot-high chain-link fence with privacy slats and a 20-foot double swing gate - Deliver and install approximately 120 cubic yards of fill material and 130 tons of surface material - OEMs and Vendors Mentioned: - LiftMaster (INFL24UL automatic gate operator system) - Hoover (CL-CANTILEVER-GATE and CL-Pre-Hung-Gate as basis of design) - Products/Part Numbers/Quantities: - 432 linear feet of 7-foot-high K-Klass chain-link fence - 1 x 20-foot sliding gate with LiftMaster INFL24UL or equivalent operator - 1 x 12-foot steel swing gate - Concrete bin blocks (quantity based on five storage bays, 4 blocks high) - 303 linear feet of 8-foot-high K-Klass chain-link fence with privacy slats - 1 x 20-foot double swing gate (Hoover CL-Pre-Hung-Gate or equivalent) - 120 cubic yards of fill material; 130 tons of surface material - Unique/Notable Requirements: - Compliance with building and electrical codes, Buy American construction material requirements - Safety, environmental, and cultural resource protection - Option line item for additional fence work at Ray's Garage - All work must be completed within 90 calendar days from Notice to Proceed - Automatic gate operator must include keypad access, timer, free-exit loop, battery backup, and manual disconnect - Privacy slats for fencing must be approved by the Contracting Officer's Representative (COR)

Description

St. Croix National Scenic Riverway - Replace Fence

View original listing