Opportunity

City of Norwalk PlanetBids #26-837

City of Norwalk Alondra Boulevard Pavement Rehabilitation Project

Posted

May 29, 2026

Respond By

June 23, 2026

Identifier

26-837

NAICS

237310, 237990

The City of Norwalk is seeking bids for a major pavement rehabilitation project on Alondra Boulevard, spanning from Studebaker Road to Gridley Road in Norwalk, Los Angeles County, California. - Government Buyer: - City of Norwalk Engineering Department - Office of the City Engineer - Scope of Work: - Comprehensive street rehabilitation including: - Cold milling of 181,000 square feet of existing asphalt concrete pavement (2-inch depth) - Removal and reconstruction of asphalt concrete pavement (4-inch: 98,500 SF; 10-inch: 2,000 SF) - Application of 2,350 tons of Asphalt Rubber Hot Mix (ARHM) overlay (2-inch thick) - Localized AC pavement repair (1,000 SF) - Reconstruction of 1,200 SF of 8-inch Portland Cement Concrete (PCC) cross gutter - Removal and replacement of sidewalk, median hardscape, driveway approaches, and concrete pavement - Installation of 8 ADA-compliant curb ramps and 1 custom access ramp - Construction of curb, gutter, median curb, retaining curb, and curb bump outs - Installation of metal hand railing (105 LF) and pedestrian barricades - Adjustment of utilities to grade (manholes, valves, pull boxes) - Pavement marking, striping, and installation of reflective markers - Removal of existing trees (3 EA) and restoration of traffic loop detectors - Mobilization, traffic control, construction surveying, and water pollution control plan - Products/Services Requested: - All labor, materials, and equipment for the above construction activities - No specific OEMs or proprietary products are specified; open to all qualified vendors - Notable Requirements: - Strict adherence to City standard plans and specifications - ADA compliance for curb ramps and access features - Liquidated damages of $3,000 per calendar day for delays - Electronic bid submission via PlanetBids portal - Estimated contract value: approximately $1,500,000 - Period of Performance: - Construction window from May through September, with 40 working days from Notice to Proceed 2 for completion of major work - All pavement treatment and substantial completion required by end of September - No OEMs or proprietary manufacturers are named; the solicitation is open to all qualified construction contractors.

Description

This project involves the rehabilitation of Alondra Boulevard pavement from Studebaker Road to Gridley Road. The scope includes cold milling existing asphalt concrete pavement, removals and reconstructions, ARHM overlays, AC base overlays, and adjusting utilities to grade. Additional work includes signing, striping, traffic control, removal and replacement of cross gutters and spandrels, adjacent curb and gutter, sidewalk, ADA curb ramps, and other related appurtenant work. The estimated cost of the work is approximately $1,500,000. Bids are to be submitted electronically by June 23, 2026, and bidders must register on the City of Norwalk PlanetBids portal to access solicitation documents.

View original listing