Opportunity
Brazos Valley Ionwave #26-038
City of Bryan Traffic Signal and Infrastructure Upgrades – Siemens, VIVIDS, APS Equipment
Posted
June 04, 2026
Respond By
June 24, 2026
Identifier
26-038
NAICS
237310, 237130, 237990
The City of Bryan Engineering Department is seeking proposals for major traffic signal and infrastructure upgrades at multiple intersections. - Government Buyer: - City of Bryan Engineering Department - Project Scope: - Removal and installation of traffic signals at E 29th St/Barak Lane, E 29th St/Stillmeadow Dr, and South College Avenue/North Avenue - Traffic striping, sidewalk and roadway pavement construction, and storm drainage utility installation - All work must comply with City of Bryan and Texas Department of Transportation (TxDOT) technical specifications, as well as federal, state, and local standards (including ADA and TAS accessibility) - OEMs and Key Equipment: - Siemens (M60 Linux signal controllers) - VIVIDS (camera systems) - APS (Accessible Pedestrian Signal) pedestrian pushbuttons - LED luminaires and infrared preemption detectors (no specific OEMs named for these) - Products/Services Requested: - Extensive list of construction materials and equipment, including concrete, conduit, electrical conductors, signal poles, LED vehicle and pedestrian signal sections, reflective pavement markings, and aluminum signs - Construction services: traffic signal removal/installation, surveying, traffic control, storm drainage installation, and related appurtenances - Notable Requirements: - Estimated construction budget: $1,757,300 - Completion required within 140 working days from Notice to Proceed - Compliance with Texas Local Government Code disclosure and Form 1295 submission for qualifying contracts - Performance and payment bonds required - Digital construction photos, value engineering, and coordination with utility companies
Description
This Request for Proposal (RFP) issued by the City of Bryan involves the removal and installation of traffic signals, traffic striping, sidewalk and roadway pavement construction, storm drainage utilities, and related appurtenances at specified intersections. The project covers two locations: E 29th St/Barak Lane and E 29th St/Stillmeadow Dr for Phase 2, and South College Avenue and North Avenue. The scope includes comprehensive infrastructure work necessary to complete the traffic signal projects. Proposals are due by June 24, 2026, with a proposal opening via Zoom.