Opportunity
Monterey Regional Waste Management District Opengov #CIP2604C
Monterey Street and Curb Ramp Rehabilitation Project Solicitation
Posted
June 03, 2026
Respond By
June 30, 2026
Identifier
CIP2604C
NAICS
237310, 237990, 238910
This opportunity involves a comprehensive street and curb ramp rehabilitation project in Monterey, CA, managed by the City of Monterey Public Works Department. - Government Buyer: - City of Monterey Public Works Department - Products and Services Requested: - Demolition and removal of existing asphalt and concrete pavement (various depths) - Construction of new concrete curbs, gutters, sidewalks, driveways, and ADA-compliant curb ramps - Pavement rehabilitation using hot mix asphalt (HMA), rubberized hot mix asphalt (RHMA-G), stress absorbing membrane interlayer (SAMI), and Class 2 Aggregate Base - Installation of street lighting and electrical systems - Application of pavement markings and thermoplastic striping - Stormwater protection, traffic control, construction staking, and earthwork services - Product Line Items (selected examples): - 95,000 sq ft Cold Plane AC Pavement (4" Depth) - 7,120 sq ft Remove AC Pavement and Base (8" Depth) - 2,800 sq ft Remove AC Pavement and Base (16" Depth) - 1,800 sq ft Remove Concrete Street - 580 linear ft Concrete Curb and Gutter - 3,900 sq ft Concrete Sidewalk - 1,700 sq ft Concrete Curb Ramp and Blended Transition - 1 unit Street Lighting and Electrical - 1,455 linear ft Pavement Markings (2-Coat Paint) - 2,950 linear ft Detail 22 Stripe (Thermoplastic) - Service Line Items: - Storm Water Compliance - Traffic Control - Construction Staking - Earthwork - Unique/Notable Requirements: - ADA-compliant curb ramps and blended transitions - Implementation of stormwater protection and traffic control measures - Adjustment of utility structures to grade - No specific OEMs or vendors are named in the solicitation - Quantities for each line item are detailed in the bid schedule - No proprietary or brand-specific products are specified
Description
This project involves demolition, earthwork, and construction for concrete curbs, gutters, sidewalks, driveways, ADA-compliant curb ramps, pavement, and storm drainage improvements. Pavement rehabilitation includes milling, placement of hot mix asphalt, rubberized hot mix asphalt, stress absorbing membrane interlayer, pavement seal coats, and Class 2 Aggregate Base. Additional work includes installation of street lighting, electrical, permanent signage, striping, curb painting, adjustment of utility structures to grade, and implementation of stormwater protection and traffic control measures.