Opportunity

Virginia Danville Civic Plus #RFQ Q004166

Danville Riverfront Park Decorative Guardrail and Chain Barrier Installation

Posted

June 03, 2026

Respond By

June 16, 2026

Identifier

RFQ Q004166

NAICS

332323, 332312, 238990

This opportunity involves improvements to Riverfront Park in Danville, Virginia, focusing on decorative guardrail and chain barrier installations. - Government Buyer: - City of Danville, Virginia, Parks and Recreation Department - Project managed by Andrew Hall - Products/Services Requested: - Custom-fabricated steel guardrail systems with stainless steel mesh infill - 2"x2" square steel tube posts, 4"x2" rectangular top rails, 2"x2" bottom rails - Type 304 stainless steel welded wire mesh infill panels (approx. 2"x2" grid, 0.120" wire diameter) - Stainless steel U-channel frame and fasteners - Decorative chain barrier systems - Steel posts (2"x2" square tube, min. 11 ga), side-mounted 3/8" round bar eyelets - Welded steel link chain (5/16" diameter, powder-coated), steel/stainless connectors - Concrete footings (24"-30" deep, 10"-12" diameter) - Site work and restoration - Field layout, excavation, installation, protection of existing features, restoration of disturbed areas - Unique/Notable Requirements: - Emphasis on custom fabrication by experienced metal fabricators - All work must comply with Virginia Uniform Statewide Building Code, International Building Code, and ASTM standards - Coordination with city staff and minimal disruption to park operations - Quality assurance and consistent installation required - No specific OEMs are named; the project is open to qualified fabricators and contractors able to meet the technical specifications.

Description

This solicitation is for improvements to guardrails and chain barriers at Riverfront Park in Danville, Virginia. The project involves furnishing and installing decorative steel guardrail systems with stainless steel mesh infill and decorative chain barrier systems, including concrete footings and site restoration. Work must be coordinated to minimize disruption to park operations and public use. The contractor is responsible for verifying field conditions, coordinating with City staff, and maintaining a safe work area. All work shall comply with specified plans, standards, and quality requirements.

View original listing