Opportunity
SAM #FA4626-26-Q-XVPL
Procurement and Installation of Two ALI GOLD Certified Two-Post Vehicle Lifts at Malmstrom AFB
Buyer
341st Contracting Squadron
Posted
June 03, 2026
Respond By
June 12, 2026
Identifier
FA4626-26-Q-XVPL
NAICS
333310, 333924, 238290
This opportunity is for the procurement and installation of two new two-post vehicle lifts at Malmstrom Air Force Base by the Air Force Global Strike Command (341st Missile Wing, Logistics Readiness Squadron, Vehicle Management). - Government Buyer: - U.S. Air Force, Air Force Global Strike Command, 341st Missile Wing, Logistics Readiness Squadron, Vehicle Management at Malmstrom AFB - Products/Services Requested: - Two new two-post vehicle lifts, each with a minimum 30,000 lbs capacity - Must be ALI GOLD certified - Key features: 4" sealed steel roller bearings, structural 7/8" forklift mast channel, no equalization cables or overhead beams, three-stage telescopic multi-position single lock low profile arms, automatic mechanical load holding locking device, emergency stop on control panel, two 3hp motors, 1" thick steel bolster plate, all required electrical wiring and hydraulic oil, electronically operated control interface, complete paint finish with markings - Removal of existing legacy lifts - Installation, leveling, and operational testing of new lifts - Sustainment plan for maintenance and certification services - Unique/Notable Requirements: - Vendor must be ALI GOLD certified - Service or repair response required within 24-72 hours - Warranty requirements: - Minimum 25-year warranty on structural components - 2-year warranty on hydraulic components - Lifetime warranty on carriage bearings - Sustainment plan must detail service requirements - Targeting small businesses under NAICS 333310, including 8(a), SDVOSB, HUBZone, and WOSB - No specific OEMs or part numbers are mentioned, but the technical requirements suggest compatibility with major commercial lift manufacturers.
Description
Vendor must provide two (2) new two-post lifts with all associated components required and including old lift removal & lift installation, with a minimum lift capacity of 30,000 lbs. Vendor must be ALI GOLD certified. Must be able to be serviced/repaired by a vendor within 24-72 hours. Must include a minimum 25-year warranty on structural components, 2-year on hydraulic components, and a lifetime warranty on carriage bearings. The Contractor must fully dismantle and remove the existing legacy lifts from the facility and complete the full installation, leveling, and operational testing of the newly procured lifts and provide a sustainment plan detailing how Contractor will meet service requirements.