Opportunity
Christiansburg Town Civicplus #26500017
Christiansburg College Street Drainage Improvements Phase II Construction Solicitation
Posted
June 02, 2026
Respond By
July 09, 2026
Identifier
26500017
NAICS
237110, 237310, 237990
The Town of Christiansburg is seeking bids for the College Street Drainage Improvements Phase II construction project, focusing on major stormwater and utility infrastructure upgrades. - Government Buyer: - Town of Christiansburg Engineering Department - Products and Materials Requested: - Extensive stormwater pipes (RCP and HDPE) in diameters from 12" to 48" - Concrete manhole structures (4 ft, 5 ft, 6 ft; round and square) - Drop inlet structures (various types and sizes) - Custom stormwater junction box (STJB1) - Silt fence (3,500 linear feet) - Asphalt and stone pavement repair materials - Utility conduits (4-inch PVC SCH 40) - Sanitary sewer and water supply materials (PVC pipe, cleanouts, laterals) - Miscellaneous: light poles, mailboxes, fences, sheds, flagpole protection/replacement - Services Requested: - Grading and site preparation - Tree and stump removal - Construction of a stormwater detention pond - Installation and removal of stormwater and sanitary sewer infrastructure - Construction of retaining walls, curbs, gutters, and sidewalks - Pavement repair and permanent stabilization - Relocation and protection of utilities and site features - Unique or Notable Requirements: - Strict environmental and safety compliance, including a Good Housekeeping/Pollution Prevention Program - Substantial completion required within 300 days, final completion within 330 days - Liquidated damages for schedule delays - Compliance with Town of Christiansburg and VDOT standards - No specific OEMs or proprietary products required; open to standard construction materials - No OEMs or named vendors are specified in the solicitation. - Project will be awarded as a single prime contract on a unit price basis.
Description
The Town of Christiansburg is soliciting sealed bids for the construction of College Street Drainage Improvements - Phase 2. The project scope includes grading, tree removal, stormwater detention pond, stormwater pipe and drop inlets, curb inlets, sidewalk, curb and gutter, a large stormwater junction box, removal and replacement of domestic sanitary sewer pump station and lateral, retaining wall, pavement repair, permanent stabilization, and associated appurtenances. Bids will be received for a single prime contract on a unit price basis. The DBE goal for this procurement is set at 0%.