Opportunity
City of St. Augustine Demandstar #RFB-UT2023-02-0-2023/SW
Annual Utility and Roadway Construction Services for City of St. Augustine
Posted
February 22, 2023
Respond By
March 28, 2023
Identifier
RFB-UT2023-02-0-2023/SW
NAICS
237110, 237310, 237990
This opportunity is for an annual construction contract with the City of St. Augustine, focused on utility and roadway infrastructure: - Government Buyer: - City of St. Augustine (local government) - Scope of Work: - Construction and repair of gravity sewer systems, force main systems, potable water systems, and storm drainage systems - On-call emergency response for system and treatment facility failures, with a required response time of two hours or less - Maintenance of traffic control, site and roadway restoration (subgrade, base, paving, striping, curb and gutter), and sidewalk restoration - Additional services: wet taps, line stops, demolition, erosion control, dewatering, bypass pumping, system testing, inspection, disinfection, clearing, grubbing, grading, grassing - Treatment facility repair, replacement, modification, demolition, pump station rehabilitation, construction layout, and as-builts - Notable Requirements: - Rapid emergency response capability (within two hours) - Broad range of construction and repair activities for utilities and roadways - Open to all licensed and qualified contractors; no specific OEMs or brands required - No specific products, part numbers, or OEMs are mentioned; the contract is for services only
Description
The City of St. Augustine is soliciting bids from licensed and qualified contractors to perform non-emergency and emergency utility and roadway construction services. The scope includes gravity sewer systems, force main systems, potable water systems, storm drainage systems, emergency response to system failures, maintenance of traffic control, site restoration, directional boring, roadway and sidewalk restoration, wet taps, line stops, demolition, erosion control, dewatering, bypass pumping, system testing, clearing, grading, treatment facility repair, pump station rehabilitation, and construction layout. The contract requires quick response times and covers a wide range of construction and repair activities related to utilities and roadways.