Opportunity
My Florida Marketplace #C007098
Engineering Services for Lift Station #60 Rehabilitation and Upgrade at Disney's Animal Kingdom
Posted
June 01, 2026
Respond By
June 25, 2026
Identifier
C007098
NAICS
541330, 237110
The Central Florida Tourism Oversight District is seeking professional engineering services for the rehabilitation and upgrade of Lift Station #60 near Disney's Animal Kingdom. - Government Buyer: - Central Florida Tourism Oversight District - Scope of Work: - Design and development of plans and technical specifications for the rehabilitation and upgrade of Lift Station #60 - Addition of a permanent, independently powered surface-mounted backup pump - Removal of the existing backup generator - Comprehensive rehabilitation of all electrical and mechanical components - Design of a bypass pumping system to ensure continuous operation during construction - Assessment and replacement of the electrical control panel - Installation of conditioning pumps, pump soft starters, and fall protection devices - Installation of a new diesel-powered emergency pump and controls - Condition assessment and repair of the crane system - Performance assessment of all four pumps - Replacement of lift station risers and bases - Recoating of the wet well and upstream manhole - Replacement of isolation gates and valves - Upgrades to SCADA equipment for 24/7 monitoring - Unique/Notable Requirements: - Emphasis on maintaining continuous station operations during construction - Upgrades to electrical, mechanical, and control systems - Comprehensive assessments and permitting included - OEMs and Vendors: - No specific OEMs or vendors are mentioned in the solicitation
Description
The Central Florida Tourism Oversight District is seeking professional engineering services to design and develop plans and technical specifications for the rehabilitation and upgrade of Lift Station #60 located on the western side of Disney's Animal Kingdom. The scope includes addition of a permanent backup pump, removal of the existing backup generator, full rehabilitation of electrical and mechanical components, design of a bypass pumping system, and various assessments and replacements related to electrical control panels, pumps, and SCADA equipment. The project emphasizes continuous operation during rehabilitation and upgrades to electrical, mechanical, and control systems.