Opportunity
Utah Public Procurement Place U3P #EMC-FY26-17
Eagle Mountain City Solicits Construction and Traffic Signal Upgrades for Silverlake Parkway & Woodhaven Blvd
Posted
June 01, 2026
Respond By
June 16, 2026
Identifier
EMC-FY26-17
NAICS
237310, 238210, 237130
Eagle Mountain City is seeking bids for the construction of new right turn lanes and associated roadway, landscaping, and traffic signal improvements at the intersections of Silverlake Parkway & Pony Express Parkway and Woodhaven Blvd & Pony Express Parkway. - Government Buyer: - Eagle Mountain City Engineering Department - Key contacts: Melissa Yates (Purchasing Agent), David Salazar - Products and Services Requested: - Roadway construction: asphalt and curb removal/replacement, trail and sidewalk work, ADA ramps, aggregate and sub base installation - Landscaping: removal and restoration of landscaping, irrigation systems, and tree removal - Stormwater: installation of storm drain inlets, high-pressure storm pipe, erosion control, and SWPPP compliance - Traffic signals and controls: - Traffic signal controller cabinet - Multiple types of signal head assemblies (3, 4, 5 section, arrow, pedestrian, hybrid beacon) - Pedestrian push buttons, audible signals, and confirmation lights - Radar detection sensors, GridSmart camera, wireless detection devices - Conduit, cables, junction boxes, and signal equipment - Preemption control system and RRFB (Rectangular Rapid Flash Beacon) - Sign panels, posts, and blank-out signs - Traffic control and quality assurance/testing - Quantities and Part Numbers: - Notable quantities: 885 LF curb removal, 425 SY asphalt removal, 7–9 trees, 5050–7825 SF landscaping, 5350–3550 SF trail removal, 8750 SY asphalt roadway, 3 ADA ramps, 1–2 sign panels/posts, multiple signal heads and detection devices - Example part number: Smart Sensor Matrix Cable (WX-SS-705) - Unique/Notable Requirements: - Compliance with UDOT standards for striping and signal work - Maintenance of one lane of traffic in each direction during construction - Specific working hours (9 AM–8 PM general, 9 AM–3 PM on Pony Express Parkway) - Coordination with local utilities - Submission of 5% bid bond, insurance verification, and 100% performance/payment bonds - Quality control and material testing required - No specific OEMs or vendors are named in the solicitation documents, but products such as GridSmart cameras and Smart Sensor Matrix Cables suggest certain manufacturers.
Description
Eagle Mountain City is requesting bids for a project involving Silverlake Parkway and Woodhaven Right Turn Lanes. The work includes furnishing and installing equipment, facilities, services, and appurtenances as per the Contract Documents. Construction involves new right turn lanes on northbound Silverlake Parkway & Pony Express Parkway and northbound Woodhaven Blvd & Pony Express Parkway, including asphalt removal, pavement, curb and gutter removal, curb and gutter, park strip restoration, trail and sidewalk removal, irrigation relocation, topsoil/reseeding, signal hardware relocation, striping, and signal adjustments. The project must maintain one lane of traffic in each direction and is to be completed in calendar year 2026 with working hours from 9 AM to 8 PM, and 9 AM to 3 PM on Pony Express Parkway.