Opportunity

Georgia Procurement Registry #2026-180000-0601

Comprehensive HVAC System Replacement and Upgrade for Henry County Board of Education Facility

Posted

June 01, 2026

Respond By

July 07, 2026

Identifier

2026-180000-0601

NAICS

238220

This opportunity involves a comprehensive HVAC system replacement and upgrade for a Henry County Board of Education facility in Georgia. - Government Buyer: - Henry County Board of Education (Georgia) - Products/Services Requested: - Replacement of wall-hung and rooftop air conditioning units - Replacement of furnaces, fan coil units, heat pumps, and ceiling-mounted water source heat pumps - Installation of new energy recovery units - Installation of a roof-mounted kitchen exhaust and make-up air system - Full replacement of the central plant, including cooling tower, heat exchanger, pumps, boilers, piping, insulation, and accessories - Integration of all new equipment into the existing Direct Digital Control (DDC) system - Modifications to gas piping and electrical connections to support new installations - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Unique/Notable Requirements: - Reuse of existing ductwork where feasible - Registration with the architect required to obtain bidding documents - Bid bond required for submission; performance and payment bonds required if awarded - All new equipment must be compatible with and integrated into the existing DDC controls system - Place of Performance: - Henry County Board of Education facility, McDonough, Henry County, Georgia

Description

The project involves comprehensive replacement and upgrade of the building’s HVAC systems, including wall-hung and rooftop air conditioning units, furnaces, fan coil units, heat pumps, and ceiling-mounted water source heat pumps, with reuse of existing ductwork where feasible. Work also includes installation of new energy recovery units and a roof-mounted kitchen exhaust and make-up air system. The central plant will be fully replaced, including the cooling tower, heat exchanger, pumps, boilers, and associated piping, insulation, and accessories. Additional scope includes integrating all new equipment into the existing DDC controls system and modifying gas piping and electrical connections to support the new installations.

View original listing