Opportunity

Shawnee County Shawnee #024-26

Concrete Sidewalk, Steps, and Parking Lot Pavement Construction at Shawnee County Annex

Posted

June 01, 2026

Respond By

July 01, 2026

Identifier

024-26

NAICS

238110, 237310, 238910

Shawnee County Public Works is seeking bids for concrete construction and replacement at the Shawnee County Annex in Topeka, Kansas. - Government Buyer: - Shawnee County Public Works (local government agency) - Scope of Work: - Construction of new 4-inch non-reinforced concrete sidewalks (1,866 SF) - Removal and replacement of 4-inch non-reinforced concrete sidewalks (310 SF) - Construction of concrete steps (1 lump sum) - Removal and replacement of 6-inch reinforced concrete parking lot pavement (56 SY) - Removal and replacement of 6-inch reinforced concrete pavement with integral curb (18 SY) - Removal and replacement of Type I curb and gutter (29 LF) - Products/Services Requested: - All labor, materials, and equipment for concrete work - Compliance with City of Topeka and Shawnee County Standard Technical Specifications - Site preparation, subgrade approval, and restoration of disturbed areas - Contractor must maintain access to the main entrance at all times - Contractor responsible for utility location prior to construction - OEMs and Vendors: - No specific OEMs or vendors are named; open to qualified construction contractors - Unique Requirements: - Work must comply with local technical specifications and standards - Insurance and bonding are required - Contractor must coordinate utility location and maintain site access during construction - Place of Performance: - Shawnee County Annex, 1515 NW Saline Street, Topeka, Kansas

Description

Shawnee County is soliciting sealed bids for the construction of new concrete sidewalk, concrete steps, and the removal and replacement of sections of deteriorated parking lot pavement and sidewalk adjacent to the east front of the Shawnee County Annex located at 1515 NW Saline Street, Topeka, Kansas. The project requires all labor, materials, and equipment necessary to construct new 4-inch concrete sidewalk, concrete steps, and the removal and replacement of sections of deteriorated 6-inch concrete parking lot pavement and 4-inch concrete sidewalk. Construction methods and materials must comply with City of Topeka Shawnee County Standard Technical Specifications. The contractor may start the project between July 27, 2026, and September 28, 2026, with 60 calendar days to achieve final completion and acceptance.

View original listing