Opportunity

Central Florida Tourism Oversight District Planet bids #C0007089

CFTOD Solicits FDOT-Qualified Contractor for Western Way Interim Roadway and Signage Improvements

Posted

May 19, 2026

Respond By

June 18, 2026

Identifier

C0007089

NAICS

237310, 238990, 238210

This opportunity involves the Central Florida Tourism Oversight District (CFTOD) seeking a qualified contractor for the Western Way Interim Improvements project in Lake Buena Vista, Florida. - Government Buyer: - Central Florida Tourism Oversight District (CFTOD), Construction Management Office - Project Scope: - Roadway improvements at Buena Vista Drive and Western Way, with additional work on Hartzog Road - Includes maintenance of traffic, temporary traffic control, lane closures, milling and resurfacing of asphalt pavement, removal of concrete traffic separator, hydro blasting of bridge deck, final pavement marking and striping - Regulatory sign installation and relocation, removal and replacement of themed wayfinding signs, signal head relocation and installation, installation of new median turn lane signal pedestals and bases, conduit, pull boxes, traffic control cabinet tie-in, erosion control, and site restoration - Products/Services Requested: - Asphalt paving (FC-12.5 Friction, 560 tons) - Traffic and regulatory signage (including themed wayfinding signs, regulatory, warning, guide, street name, directional, and overhead signs) - Signal pedestals, foundations, conduit, signal cable, pull boxes, directional bores - Construction services: project management, field coordination, daily reporting, maintenance of traffic, erosion and sedimentation control, site stabilization, utility locates, irrigation and landscape (excluding sod) - Fabrication and installation of signage using 3M Diamond Grade DG Reflective Sheeting (notably for Walt Disney World area signage) - Notable Requirements: - Only FDOT prequalified contractors in specific classes (#10 Flexible Paving, #13 Guardrail, #15 Hot Plant-Mixed Bituminous Courses, #28 Pavement Marking, #38 Roadway Signing, #39 Traffic Signal) are eligible - Strict safety, quality control, and insurance requirements - Phased construction to maintain traffic circulation and public safety - Coordination with Reedy Creek Energy Services for utility outages - Compliance with MUTCD standards for signage - OEMs and Vendors: - 3M (for Diamond Grade reflective sheeting on signage) - No other specific OEMs or vendors named - Locations: - Primary work at Buena Vista Drive and Western Way, and Hartzog Road, Lake Buena Vista, FL - CFTOD offices at 1900 Hotel Plaza Boulevard, Lake Buena Vista, FL 32830 - No set-aside or local preference restrictions, but affidavits for local, veteran, and opportunity zone business eligibility are included

Description

The Western Way Interim Improvements project involves maintenance of traffic, temporary traffic control, lane closures, milling and resurfacing of existing asphalt pavement, removal of existing concrete traffic separator, hydro blasting of the bridge deck, final pavement marking and striping, regulatory sign installation and relocation, removal and replacement of themed wayfinding signs, relocation and installation of signal heads, installation of new median turn lane signal pedestals and bases with associated conduit, pull boxes, traffic control cabinet tie-in work, erosion control, and site restoration. The work is located at Buena Vista Drive and Western Way, with additional work along the northbound approach of Hartzog Road. Construction activities are phased to maintain traffic circulation and safety. The project requires FDOT prequalified contractors with specific FDOT classes.

View original listing