Opportunity

Palm Springs Planet bids #22-21B

Palm Springs Racquet Club Road Reconfiguration and Bicycle Lane Construction

Posted

May 28, 2026

Respond By

June 18, 2026

Identifier

22-21B

NAICS

237310, 238210

The City of Palm Springs is seeking a contractor for the Racquet Club Road Reconfiguration project, which focuses on roadway improvements and bicycle lane installation. - Government Buyer: - City of Palm Springs Engineering Department (Engineering Services Department, City Engineer's Office) - Project Scope: - Installation of Class II bicycle lanes along Racquet Club Road and North Farrell Drive between North Palm Canyon Drive and Via Escuela - Reconfiguration of the roadway from four travel lanes to a three-lane section (one lane each direction, two-way left-turn lane, curbside parking) - Associated signing, striping, and pavement improvements - Construction activities include mobilization, water pollution control, clearing and grubbing, construction survey, traffic control, pavement removal and replacement, concrete curb/gutter/sidewalk/ramps, driveway construction, utility adjustments, and signage - Electrical systems work includes lighting, signal heads, pedestrian signals, push button assemblies, and fiber optic cable systems - Products and Materials: - Hot mix asphalt (Type A, rubberized, open graded friction course, bonded wearing course) - Portland cement concrete (minor, rapid strength, lean concrete base) - Electrical equipment and materials for traffic and pedestrian systems - Traffic striping and pavement marking materials (paint, thermoplastic) - Quantities and Line Items: - Over 20 detailed line items, including 46,280 sq ft of cold planed asphalt, 3,930 sq ft of sidewalk, 6,140 sq ft of asphalt removal, and multiple utility adjustments - Notable Requirements: - Valid California Class A Contractor's License required - Compliance with prevailing wage laws and Community Workforce Agreement - Electronic certified payroll reporting - 10% bid bond and liquidated damages of $3,000 per day for late completion - One-year warranty on completed work - Adherence to Caltrans standards for materials and construction methods - No specific OEMs or proprietary vendors are named; materials must meet Caltrans and project specifications - Estimated contract value: $3,800,000 - Place of Performance: - Racquet Club Road corridor and adjacent addresses in Palm Springs, CA

Description

This project involves installing Class II bicycle lanes along Racquet Club Road and North Farrell Drive between North Palm Canyon Drive and Via Escuela. The scope includes associated signing, striping, and pavement improvements. The existing roadway will be reconfigured from four travel lanes to a three-lane section with one travel lane in each direction, a two-way left-turn lane, and strategically located curbside parking. The work must be completed within 40 working days. The estimated contract value is $3,800,000.

View original listing