Opportunity
Palm Springs Planet bids #BID 22-21A
Palm Springs South Palm Canyon Road Reconfiguration and Bike Lane Construction Opportunity
Posted
May 28, 2026
Respond By
June 18, 2026
Identifier
BID 22-21A
NAICS
237310, 237990, 238990, 541320
The City of Palm Springs Engineering Services Department is seeking bids for the South Palm Canyon Road Reconfiguration project, which aims to improve roadway safety and accessibility. - Government Buyer: - City of Palm Springs Engineering Services Department - City Engineer: Joel Montalvo, P.E. - Project Scope: - Installation of Class II bicycle lanes along South Palm Canyon Road (Acanto Drive to East Palm Canyon Drive) - Reconfiguration of roadway from four lanes to three (one lane each direction, two-way left-turn lane) - Addition of curbside parking - Associated signing, striping, and pavement improvements - Construction includes mobilization, water pollution control, clearing, survey/staking, traffic control, pavement removal/replacement, sidewalk and curb construction, utility adjustments, signage, and striping - Products and Materials Requested: - Portland cement concrete (part number 201-1) - Asphalt concrete mixtures (part number 203-6; includes polymer modified and rubberized types) - Joint sealants (part number 201-3) - Geotextiles (part number 300-8) - Traffic striping paint (part number 214-4) - Thermoplastic material for striping/markings (part number 214-5) - Pavement markers (part number 214-6) - Cold milling of pavement (part number 404) - Temporary traffic control devices (part number 601-3) - Landscaping materials (part number 800-1) - Services Requested: - Construction services for all above work - Notable Requirements: - Compliance with Caltrans standards and California prevailing wage laws - Community Workforce Agreement - Class A contractor license required - Performance, payment, and warranty bonds - Liquidated damages of $3,000 per day for delays - One-year warranty for defective materials or workmanship - Estimated contract value: $3,750,000 to $4,000,000 - No specific OEMs are named; materials must meet Caltrans and industry standards - Open to qualified contractors with relevant experience and licensing
Description
This solicitation is for the South Palm Canyon Road Reconfiguration project in the City of Palm Springs, California. The work involves installing Class II bicycle lanes along South Palm Canyon Road between Acanto Drive and East Palm Canyon Drive, including signing, striping, and pavement improvements. The roadway will be reconfigured from four lanes to a three-lane section with one lane in each direction, a two-way left-turn lane, and curbside parking. The project must be completed within 40 working days and has an estimated value of $3,750,000.