Opportunity
Hawaii eProcurement Portal #B26002989
Hawaii Army National Guard Parking Lot Rehabilitation at Fort Ruger, Oahu
Posted
May 27, 2026
Respond By
June 10, 2026
Identifier
B26002989
NAICS
237310, 238990
This opportunity involves the rehabilitation of the HQ B90 parking lot at Fort Ruger, Oahu, managed by the Hawaii Army National Guard under the State of Hawaii Department of Defense. - Government Buyer: - State of Hawaii Department of Defense, Hawaii Army National Guard, Engineering Office - Project Scope: - Removal of 3 inches of existing asphalt concrete pavement (approx. 44,000 sq ft base area) - Repair of base course with similar material and scarification up to 2 inches if needed - Application of 3-inch thick Hot Mix Asphalt (HMA) State Mix V, compacted to 91% (third-party testing required) - Installation of concrete thru gutter per project drawings - Replacement of electrical conduit under speed bumps, including demolition, verification, and new construction - Paint striping for parking lot, including ADA-compliant stalls and access aisles - Bid Structure: - Base Bid Area (~44,000 sq ft) - Alternate #1 (~21,000 sq ft) - Alternate #2 (~9,000 sq ft) - Unique Requirements: - Third-party testing agent must monitor and report on pavement compaction - Davis-Bacon wage rates and apprenticeship preferences apply - Minimal disruption to surrounding operations; compliance with safety and environmental regulations - Valid State of Hawaii contractor's license required - Estimated Maximum Cost: $750,000 - Period of Performance: - 30 calendar days for base bid; each alternate adds 30 days if exercised - Location: - Fort Ruger, 3949 Diamond Head Road, Honolulu, Hawaii 96816-4495 - OEMs/Vendors: - No specific OEMs or vendors are named in the solicitation
Description
This solicitation is for the construction and rehabilitation of the HQ B90 parking lot at Diamond Head, Oahu, under the Hawaii Army National Guard. The scope includes removal of 3 inches of existing asphalt pavement, repair of base course defects, application of a 3-inch thick topcoat of Hot Mix Asphalt, and compaction monitoring. The work must be completed with minimal disruption to surrounding operations and comply with safety and environmental regulations. The project has an estimated maximum cost of $750,000 and must be completed within 30 consecutive calendar days upon breaking ground.