Fairhope Granicus #26-016-2023-PWI-013

City of Fairhope Solicits Bids for Parker Road Sidewalk Construction and Related Infrastructure

Posted

October 04, 2023

Respond By

March 10, 2026

Identifier

26-016-2023-PWI-013

NAICS

237310, 238110, 237990

The City of Fairhope, Alabama is soliciting bids for the construction of a new 6-foot-wide concrete sidewalk along Parker Road, extending from Main Street to US-98 and connecting to the Eastern Shore Trail. - Government Buyer: - City of Fairhope Public Works Department and Purchasing Department - Project Scope: - Construction of approximately 2,100 linear feet of 4-inch thick concrete sidewalk - Installation of bridge and sidewalk handrails (48 linear feet) - Storm sewer pipe (24" Class 3 R.C., 4 units) - Concrete driveways (6" thick, 22 units) - Detectable warning surfaces (200 units) for ADA compliance - Curb ramps (27 units), minor structure concrete, wingwalls, concrete gutter, manhole frame and cover resets - Topsoil (625 units), solid sodding (2,000 units), silt fencing (1,977 units), erosion control (wattles, silt fence removal) - Pest control treatment, construction safety fencing, geometric controls - Traffic control: markings (3,100 units), sign relocation, signal poles, pedestrian heads, conduit, construction signs, channelizing drums, cones, barricades, arrow boards, portable changeable message signs - Notable Requirements: - All materials and equipment must meet ALDOT (Alabama Department of Transportation) standards and project specifications - Coordination with the City Arborist is required for tree root protection - Compliance with all permitting, inspection, DBE/EEO requirements, and federal funding guidelines - No specific OEMs or manufacturers are named; products must conform to ALDOT and project standards - Engineer's estimate for the project is $340,000 - Project duration is approximately 150 calendar days after Notice to Proceed

Description

The City of Fairhope is soliciting bids for the construction of a new 6-foot-wide sidewalk along Parker Road. The project extends from Scenic Highway 98 to the Eastern Shore Trail, just east of the U.S. 98 and Parker Road intersection. The scope includes providing all materials, equipment, labor, and incidentals necessary for the installation. The project is managed by the Public Works Department and includes detailed plans and specifications. Bids are due by March 10, 2026, at 10:00 AM local time.

View original listing