Opportunity
Texas State University SCIQuest #CSP #754-RF MITTE 4240 & 4235
General Contractor Sought for RF MITTE 4240 & 4235 Labs Renovation at Texas State University
Posted
October 01, 2023
Respond By
June 18, 2026
Identifier
CSP #754-RF MITTE 4240 & 4235
NAICS
236220
Texas State University is seeking a General Contractor for the renovation of RF MITTE Rooms 4240 & 4235 Labs at its San Marcos campus. - Buyer: Texas State University (higher education institution) - Scope of work includes: - Removal and replacement of existing VCT flooring and carpet with monolithic flooring - Installation of blackout blinds/shades and blackout curtains with independent lighting - Removal and patching of doors; patching and painting throughout labs - Installation of upper and lower cabinets (with mobile pedestals), sinks, and double-barrel drench hoses - Installation of fume extraction arms (not full fume hoods) to cover multiple work zones - Replacement of two fume hoods (part number: 4-0W fume hood) with sinks, compressed air, and gas taps - Installation of emergency shower and new counter-height electrical outlets - Provision for mini refrigerators with backup power - Installation of compressed air lines for workstations - Delivery of existing ovens and fume hood to Materials Management Warehouse - Provision of samples for lab cabinets, flooring, and paint swatches for coordination - Services required: - General contracting for all demolition, installation, and finishing work - Testing, balancing, and third-party commissioning of fume hoods (commissioning by owner) - Notable requirements: - Adherence to Texas State University Construction Standards - Total construction cost limitation is $615,000 - Samples of key materials required for approval - Third-party testing and commissioning of fume hoods - No specific OEMs or vendors are named in the solicitation - Project location: RF MITTE Rooms 4240 & 4235 Labs, Texas State University, San Marcos, TX; delivery to Materials Management Warehouse
Description
Texas State University is soliciting Competitive Sealed Proposals for selection of a General Contractor firm for the RF MITTE Rooms 4240 & 4235 Labs Project. The scope includes removal and replacement of flooring, installation of blackout blinds, removal and patching of doors, installation of cabinets, sinks, fume extraction arms, compressed air lines, and other lab equipment as per detailed plans. The project follows Texas State University Construction Standards and has a total construction cost limitation of $615,000. The project site is Texas State University in San Marcos, TX.