Opportunity
CanadaBuys #7720
Highway Rehabilitation and Bituminous Pavement Construction on PTH 67 in Manitoba
Posted
May 27, 2026
Respond By
June 10, 2026
Identifier
7720
NAICS
237310, 237990
Manitoba Transportation and Infrastructure is seeking bids for a major highway rehabilitation and construction project: - Project covers 4.5 km of Provincial Trunk Highway 67, from 300 meters east of PR 236 to 100 meters west of PTH 7 - Located within the Rural Municipality of Rockwood and the Town of Stonewall - Scope of work includes: - Reclamation of existing pavement - Construction of new bituminous shoulders - Mobilization of equipment - Traffic control (Level IV) and pilot vehicle operation - Shoulder preparation (Type II) - Supply and placement of granular base course for shoulders (3,900 metric tonnes) - Milling and removal of existing bituminous pavement (4,500 metric tonnes) - Installation of temporary overlay markers (1,500 units) - Waste excavation (200 units) - Application of prime coat (21,840 units) - Supply and installation of Class "B" bituminous pavement (16,000 metric tonnes) - Installation of rumble strips on shoulders and centerline (9,000 units each) - No specific OEMs or vendors are named in the solicitation - Competitive open bidding process; full details available on MERX - Place of performance is Provincial Trunk Highway 67 in Manitoba; contracting office is located in Winnipeg - Quantities for each item are specified in the bid schedule - Notable requirements include traffic management, pilot vehicle operation, and rumble strip installation
Description
This solicitation is for the construction of bituminous pavement including reclamation of the existing bituminous pavement, and construction of bituminous shoulders with granular base course on Provincial Trunk Highway 67 from approximately 300 m east of PR 236 to approximately 100 m west of PTH 7. The total construction length is approximately 4.5 km in the Rural Municipality of Rockwood and the Town of Stonewall. The work includes various tasks such as mobilization of equipment, traffic control, pilot vehicle operation, shoulder preparation, milling bituminous pavement, prime coat application, and installation of rumble strips.